MP Winningen - removing, renovating, constructing and connecting water intake manholes
Brabant Water NV has a master plan for 2025-2032 in which 162 water intake manholes will be replaced, 17 manhole chambers renovated, and 149 existing manholes filled in at 19 locations. The assignment concerns the removal of the manholes to be replaced, the construction and renovation of water intake chambers including mechanical and electrical installations, and connection to the existing infrastructure. The procurement is not public and focuses on works. The contracting authority expects an integrated approach with attention to technical quality, safety, and minimal disruption to the water infrastructure.
Works · Restricted · European procedure
01What is being requested
Brabant Water NV has a master plan for 2025-2032 in which 162 water intake manholes will be replaced, 17 manhole chambers renovated, and 149 existing manholes filled in at 19 locations. The assignment concerns the removal of the manholes to be replaced, the construction and renovation of water intake chambers including mechanical and electrical installations, and connection to the existing infrastructure. The procurement is not public and focuses on works. The contracting authority expects an integrated approach with attention to technical quality, safety, and minimal disruption to the water infrastructure.
Brabant Water has drawn up a master plan to, on the one hand, replace water intake manholes and, on the other hand, expand the number of water intake manholes; it concerns the replacement of 162 water intake manholes, renovation of 17 manhole chambers, and filling in 149 existing manholes at 19 locations during the period 2025-2032. The assignment concerns the removal of the existing manholes to be replaced, the construction / renovation of water intake chambers, including mechanical and electrical installations, plus connection to existing infrastructure.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the specific scope of the works within the master plan?
What technical works are expected for the water intake manholes?
During which period will the works be carried out?
Automatically compiled from the official tender data and documents.