AwardedSuppliesEuropeanSME-friendlyOpenGreen

Milieupas controllers and Diftar data management

Gemeente Kampen · Open · 2 lots · 367947
Type
Supplies
48000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

Replacement of approximately 257 Milieupas controllers and the associated software for underground containers in the Municipality of Kampen due to the expiration of the 2G/3G network. The assignment includes hardware, software, installation, communication, and a continuity arrangement.

Supplies · Open · European procedure · SME-friendly

SME-friendlySustainability countsEuropeanComplete timeline
Contracting authority
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
2
2 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 48SuppliesSME-friendlyEU tenderGreen / SPP

01What is being requested

Delivery and installation of approximately 257 Milieupas controllers and a Container Management System (CMS) to replace current systems that communicate via 2G/3G. The assignment includes the replacement of hardware and software for both existing and new underground containers to continue the Diftar processes.

It is expected that KPN's 2G/3G communication will expire in December 2026. As a result, the emptying data of mini-containers and registration of waste passes can no longer be charged to residents via the variable part of the waste collection levy. To improve the service delivery of the Municipality of Kampen, it has been decided to bring data registration back under its own management. This not only improves the service delivery of Municipal Works, but also ensures a faster and easier issuance of environmental passes and mini-containers. Additionally, the current double registration of pass m

48000000Supplies
1Milieupas controllers and CMS
2CMS Backoffice

02Outcome

Awarded

VConsyst B.V.

Bidders
5

03Breakdown by lot

Milieupas controllers and CMSn/a
CMS Backofficen/a

Per-lot values not published — bars show only the lot breakdown.

04Strategic insight

Strategic insight · AI analysis
Ensure full technical integration where the hardware complies with the IP66 standard and STOSAG guidelines. It is crucial to guarantee continuity via a notarial escrow arrangement. Pay specific attention to the delivery time of replacement parts, which must be between 2 and 3 working days.
Read automatically from the tender documents using AI. Always verify against the original documents.

05Points of attention

Important · 6
The contractor is responsible for the removal and processing of removed components such as batteries and electronic locks.Important
Installation must not lead to damage to the coating or thermal sinking.Important
It is not permitted to weld to the container.Important
The work per container may take a maximum of four hours.Important
The contractor must provide a test environment with fictitious data for training and testing.Important
The communication costs must be specified separately, but must be included in the subscription costs for communication between the unit and software.Important

06Can I take part?

Technical · 5
The system has CE approval.Technical
The contractor guarantees a technical lifespan of at least 10 years (with the exception of the battery).Technical
The contractor complies with the open standard (STOSAG) for communication between pass, container, and software.Technical
The contractor must arrange an Escrow/continuity arrangement with a notary for the legal and technical safeguarding of the source code and software.Technical
The contractor must have a helpdesk available that is reachable on working days between 07:00 and 18:00.Technical

07Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

08Process & timeline

Completion of replacement
01-11-2025
Submission of project planning
2 weken na opdracht
Continuity arrangement active
30 dagen na ondertekening of eerste acceptatietest

09Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

10Bidders in this segment

#Likely bidderFitWins
1Centric Netherlands B.V.SME9431×
2PinkRoccade Local Government B.V.SME9344×
3Mintlab B.V.SME8616×
4SSI Schäfer Plastics Benelux B.V.SME86
5Dustin Netherlands B.V.SME8413×
6xxllnc Belastingen B.V.SME79

11Tender documents

TN512104 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250904154946pdfSep 6, 2025 · 15 KB
10042025 Nota van Inlichtingen 2xlsxApr 10, 2025 · 20 KB
Nota van Inlichtingen 1xlsxMar 19, 2025 · 426 KB
Afmetingen bestaande controllerspdfMar 19, 2025 · 514 KB
19032025 Bijlage VIII Inschrijfstaat Perceel 1 en perceel 2xlsxMar 19, 2025 · 17 KB
Bijlage IV Verklaring Kerncompetentie perceel 1docxFeb 18, 2025 · 49 KB
Bijlage XIII GIBIT2023pdfFeb 18, 2025 · 1110 KB
14022025 Beschrijvend Document V1.0pdfFeb 18, 2025 · 395 KB
Bijlage VI Verklaring Russische partijendocxFeb 18, 2025 · 43 KB
Bijlage XI Architectuurprincipes v2.1pdfFeb 18, 2025 · 133 KB
Bijlage XVIII SROI toelichtingpdfFeb 18, 2025 · 265 KB
uea_512104_20250217101432pdfFeb 18, 2025 · 1586 KB

12Legal themes that may be relevant here

13Frequently asked questions

What is the reason for this replacement of the Milieupas controllers?
In December 2025, KPN's 2G/3G communication will expire. This means that emptying data of mini-containers and the registration of waste passes can no longer be recorded, making settlement via the variable part of the waste collection levy no longer possible.
What is the goal of switching to in-house management of data registration?
By taking data registration in-house, the municipality aims to improve the service delivery of Municipal Works and ensure a faster and easier issuance of environmental passes and mini-containers. Additionally, the chance of errors is reduced because the current double registration of pass and container mutations is no longer necessary.
What terminology does the municipality use for access control of passes?
The Municipality of Kampen does not use the industry terms 'Whitelist' and 'Blacklist'. Instead, the terms 'Mag Wel lijst' (for passes/containers that are allowed to offer) and 'Mag Niet lijst' (for passes/containers that are not allowed to offer) are used.
What is the scope of the required hardware for the Milieupas controllers?
The assignment concerns the purchase of approximately 257 Milieupas controllers and an associated CMS to replace the current systems, in order to continue the registration in support of the Diftar processes.

Automatically compiled from the official tender data and documents.

14Estimated value versus the market

p25
€ 350K
median
€ 737K
p75
€ 1,9 mln
deze opdracht

Gegunde waarden in CPV 48 · leveringen n=653