AwardedSuppliesEuropeanOpen

Furniture

Baanbrekers · Open · 1 lots · 347314
Type
Supplies
39130000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender for the supply and assembly of furniture has been successfully awarded to a supplier. Delivery is planned between 1 May 2025 and 30 June 2025, with final handover before 1 May 2025. The contracting authority determines the interior concept via an appointed interior architect.

Supplies · Open · European procedure

European
Contracting authority
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
09:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 39SuppliesEU tender

01What is being requested

The tender for the supply and assembly of furniture has been successfully awarded to a supplier. Delivery is planned between 1 May 2025 and 30 June 2025, with final handover before 1 May 2025. The contracting authority determines the interior concept via an appointed interior architect.

This initially concerns the supply of suitable Furniture to fulfill a new interior concept, as drafted by the interior architect appointed by the Contracting Authority. The delivery and assembly of the Furniture must take place in the period between 1 May 2025 and 30 June 2025. It is expected that the building will be definitively handed over before 1 May 2025. The Contracting Authority will communicate the final commencement date for the final delivery date, including assembly, no later than 15 April 2025.

39130000Supplies
1Furniture

02Outcome

Awarded

Aarts & Co Kantoor- en Projectinrichters B.V.

Bidders
5

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Heutink Primair Onderwijs B.V.SME95149×
2Eromesmarko B.V.SME95105×
3Presikhaaf Schoolmeubelen B.V.SME9551×
4Ahrend Nederland B.V.SME9458×
5Gispen Nederland BVSME9292×
6Reinders OisterwijkUnknown8929×

06Legal themes that may be relevant here

07Frequently asked questions

What is the intended period for the delivery and assembly of the furniture?
The delivery and assembly of the furniture must take place in the period between 1 May 2025 and 30 June 2025.
When will the final delivery date, including assembly, be announced?
The contracting authority will communicate the final commencement date for the delivery date, including assembly, no later than 15 April 2025.
On what basis must the furniture be delivered?
The furniture must fit the implementation of the new interior concept, as drafted by the interior architect appointed by the contracting authority.
What is the expected status of the building during delivery?
It is expected that the building will be definitively handed over before 1 May 2025.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 196K
median
€ 480K
p75
€ 1,5 mln
deze opdracht

Gegunde waarden in CPV 39 · leveringen n=792