ClosedSuppliesMarktconsultatie

Market Consultation Project Solar Park Maastricht Aachen Airport

Type
Supplies
09330000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Maastricht Aachen Airport and MAA BI are looking for a market party capable of realizing an initial tranche of PV installation in the short term. The focus lies on sustainable energy generation, smart storage, and deployment within the airport's operational processes. The desired structure is a Design-Build-Finance-Maintain-Operate (DBFMO) model, in which a single party is responsible for design, construction, financing, maintenance, and operation. The procurement requires a rapid start, integration with existing infrastructure, and a clear roadmap for scaling up. The contracting authority expects a partner with proven experience in solar energy projects for critical infrastructures, who can also contribute to the energy efficiency and operational continuity of the airport.

Supplies · Marktconsultatie · National procedure

Contract type
Supplies
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 09SuppliesPVsolarDBFMO

01What is being requested

Maastricht Aachen Airport and MAA BI are looking for a market party capable of realizing an initial tranche of PV installation in the short term. The focus lies on sustainable energy generation, smart storage, and deployment within the airport's operational processes. The desired structure is a Design-Build-Finance-Maintain-Operate (DBFMO) model, in which a single party is responsible for design, construction, financing, maintenance, and operation. The procurement requires a rapid start, integration with existing infrastructure, and a clear roadmap for scaling up. The contracting authority expects a partner with proven experience in solar energy projects for critical infrastructures, who can also contribute to the energy efficiency and operational continuity of the airport.

Maastricht Aachen Airport and MAA BI (Maastricht Aachen Airport Beheer & Infrastructuur) are looking for a market party capable of starting an initial tranche of PV installation in the short term, in line with the philosophy of: 1. (Sustainable) Energy Generation 2. Smart Energy Storage 3. Smart Energy Deployment in Operations MAA B&I is considering a structure such as a Design, Build, Finance, Maintain, Operate (DBFMO) structure.

09330000Supplies

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

03Likely competitors

#Likely bidderFitWins
1Eneco Zakelijk B.V.SME8221×
2De Groene Stroomfabriek N.V.SME8119×
3E2-EnergieUnknown8010×
4VanHelderUnknown7813×
5N.V. Vattenfall Sales NederlandSME7416×
6Innova DuurzaamUnknown72

04Tender documents

TN398906 - SF01 Vooraankondiging 20230227140140pdfMar 1, 2023 · 17 KB
Marktconsultatiedocument Project Zonnepark Maastricht Aachen AirportdocxMar 1, 2023 · 735 KB
230213 energy pv 2035 marktconsultatie[4]pdfMar 1, 2023 · 2078 KB

05Legal themes that may be relevant here

06Frequently asked questions

Which contract form is being considered for the realization of the PV installation?
For the execution of the assignment, Maastricht Aachen Airport and MAA BI are considering a structure such as a Design, Build, Finance, Maintain, Operate (DBFMO) structure.
What are the core components of the energy vision for this project?
The project philosophy is based on three pillars: (sustainable) energy generation, smart energy storage, and smart energy deployment in operations.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 300K
median
€ 691K
p75
€ 2,0 mln
deze opdracht

Gegunde waarden in CPV 09 · leveringen n=226