ClosedServicesMarktconsultatie
Market Consultation - Monitoring track stability PHS
ProRail B.V. · Marktconsultatie · 363850
6
6 of 6 core insights found
Measures presence, not accuracy · documents remain authoritative
ScopeAdvicePoints of attentionSuitability requirementsAward criteriaTimeline
Type
Services
51200000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high
Market consultation for the installation of monitoring systems to measure track stability and pore water pressure at various rail locations in support of the High-Frequency Rail Program.
Services · Marktconsultatie · National procedure
Complete timeline
CharacteristicsCPV 51Services
01What is being requested
The installation of approximately 14 monitoring systems to measure the pore water pressure in the track bed on three PHS corridors and two additional locations for a period of 5 years.
Market consultation for the purpose of monitoring track stability on 3 PHS corridors.
02Strategic insight
Strategic insight · AI analysis
Ensure a strong substantiation of the equivalence of the sensors used under varying train loads. Take into account the strict installation time during night works. Also offer expertise in the field of maintenance and fault management of the systems.
03Points of attention
Important · 4
The pore water pressure meters must be equivalent to the Geokon Model No. 3400S-1 brand.Important
The installation in the borehole has a limited time of approximately 3 net hours during the night.Important
The system must function standalone without impact on the rail infrastructure.Important
The data must be provided in the Apache Parquet format.Important
04Can I take part?
Technical — The equivalence of the pore water pressure meters must be demonstrated upon tender, specifically demonstrating behavior under varying train loads.
Other — ProRail intends to make use of further selection requirements and minimum experience requirements.
05Award criteria
Sustainabilityweight n/a
Forms part of the award criteria in the form of the CO2 Prestatieladder (ambition level).
06Process & timeline
Publication / invitation to participate in market consultation
15 januari 2025
Deadline for submitting answers
7 februari 2025
Start selection
01-04-2024
Final award
01-09-2024
07Value in context
Estimate not published
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.
08Likely competitors
#Likely bidderFitWins
1Sweco Nederland B.V. SME682×
2Iv-Infra B.V.SME683×
3Geonius Groep B.V.SME671×
4DEKRA Rail bvSME641×
5Asset.InsightUnknown631×
6Stantec B.V.SME631×
09Tender documents
Bijlage 2 - Marktconsultatie vragenlijstxlsxFeb 4, 2025 · 22 KB
TN505929 - EF05 Periodieke indicatieve aankondiging die alleen ter informatie wordt gebruikt - sectorale richtlijn 20250204102515pdfFeb 4, 2025 · 5 KB
TN505929 - EF05 Periodieke indicatieve aankondiging die alleen ter informatie wordt gebruikt - sectorale richtlijn 20250115105539pdfJan 15, 2025 · 5 KB
Marktconsultatiedocument Monitoring Baanstabiliteit PHS V1.0pdfJan 15, 2025 · 362 KB
10Legal themes that may be relevant here
Advies 307> Renovatie tunnel op basis van Design, Build & Maintain-contract. Als er paritair opgestelde voorwaarden zijn, mogen op grond vanAdvies 36> Openbare aanbestedingsprocedure met betrekking tot een overheidsopdracht voor de reiniging van metrovoertuigen. Klager voldoet vAdvies 671> Ondernemer klaagt op 9 onderdelen over drie aanbestedingen onder een erkenningsregeling voor het sluiten van een overeenkomst voAdvies 611> Een Europese openbare aanbestedingsprocedure voor de renovatie van een rioolwaterzuiveringsinstallatie is beëindigd en aanbestedAdvies 221> In geschil is het perceel sanitaire voorzieningen van een aanbesteding van een schoonmaakcontract. De inschrijvers wordt gevraag
11Frequently asked questions
What kind of systems will be installed during the assignment?
The assignment concerns the installation of approximately 14 monitoring systems to obtain real-time data on the pore water pressure in the subsoil.
Automatically compiled from the official tender data and documents.
12Estimated value versus the market
p25
€ 295K
€ 295K
median
€ 672K
€ 672K
p75
€ 1,5 mln
€ 1,5 mln
deze opdracht
Gegunde waarden in CPV 51 · diensten n=96