PlannedWorksEuropeanGreen

Market Consultation Mobility Hub Hengelo ‘Hub Hart van Zuid’

Gemeente Hengelo · 1 lots · 424838
Type
Works
45000000 · Construction works
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
3 criteria
Assess manuallyconfidence high

This market consultation concerns the realization of a mobility hub in the historic Overweghal in Hengelo, where the focus lies on the combination of heritage preservation and the installation of a parking garage.

Works · European procedure

Sustainability countsEuropeanComplete timeline
Contracting authority
Contract type
Works
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Construction works
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPP

01What is being requested

The assignment concerns the realization of a mobility hub in the existing Overweghal, consisting of works on the outer shell and the installation of a parking garage with public facilities. The hub must provide at least 560 parking spaces and facilities for shared mobility.

The Municipality of Hengelo has the ambition to realize a high-density urban living and residential environment in the area named ‘Hart van Zuid’. This requires a different layout of the area with high density, yet high-quality living standards with more space for cyclists, pedestrians, greenery, and thus less space for cars. Consequently, the parking requirement in this area is a major challenge. A mobility hub, providing not only space for parking but also, among other things, shared mobility, sports opportunities, and meeting places, must address this (see chapter 2 for the project descript

45000000Works
1Market Consultation Mobility Hub Hengelo ‘Hub Hart van Zuid’

02Strategic insight

Strategic insight · AI analysis
Focus on the integral cooperation between the renovation of the outer shell and the new installation, as the interfaces here are crucial. Demonstrate expertise in combining heritage preservation with modern, functional requirements such as parking capacity and energy supply. Prepare for a construction team (ECI) model where design freedom and price certainty via a UAV-GC contract type are central.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 6
<strong class='emphasis'>Heritage value: the preservation of the historical value and industrial experience of the Overweghal is central.Important
<strong class='emphasis'>Energy network: there must be sufficient capacity for electric vehicles and shared mobility.Important
<strong class='emphasis'>Flexibility: the spaces must be flexibly divisible for future functions or changes in parking demand.Important
<strong class='emphasis'>Fire safety: take into account fire spread between nearby buildings and safe escape routes.Important
<strong class='emphasis'>Complex execution: building in an existing historic building requires extra preparation and careful handling of existing elements.Important
<strong class='emphasis'>Interfaces: there is a strong dependency between the renovation of the outer shell and the installation of the parking garage.Important

04Can I take part?

Technical · 4
experience with renovation works of existing (historic/monumental) buildings commissioned by or under the guidance of the Rijksdienst voor Cultureel Erfgoed (RCE)Technical
experience with design and realization of a public above-ground parking garageTechnical
experience with urban construction or building-in-building situationsTechnical
experience with working in a construction team (ECI) arrangementTechnical

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

vision on cooperation within the construction team context (including presentation and explanation)weight n/a

Vision on the cooperation within the context of the construction team.

approach to managing interfaces and risks in the construction team phaseweight n/a

The manner in which interfaces and risks are managed during the construction team phase.

approach to cost controlweight n/a

Assessment of the approach to cost control, consisting of the rates of officials and depreciable elements of the outer shell.

07Process & timeline

publication of market consultation document
woensdag 13 mei 2026
registration for market consultation and deadline for submitting questions
vrijdag 29 mei 2026
physical meeting
woensdag 3 juni 2026 (ochtend)
(optional) individual meetings with market parties
woensdag 10 juni 2026 - vrijdag 12 juni 2026
publication of general market consultation report
woensdag 24 juni 2026
tender phase (publication - deadline for submission of tenders)
november 2026 - februari 2027
award
maart 2027
start of realization
uiterlijk 31-12-2027

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

09Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME9477×
2Den Ouden Aannemingsbedrijf B.V.SME9423×
3KWS Infra B.V.SME9392×
4Van Gelder BVSME9353×
5Strukton Rail Nederland bvSME9033×
6Roelofs Infra Groep B.V.SME8613×

10Tender documents

Marktconsultatiedocument.pdfpdfMay 13, 2026 · 33 KB
Beschrijving.pdfpdfMay 13, 2026 · 30 KB
Marktconsultatie – Mobiliteitshub Hengelo ‘Hub Hart van Zuid’ Gemeente Hengelo.pdfpdfMay 13, 2026 · 809 KB
Antwoordblad Markconsultatie Mobiliteitshub Hengelo 'Hub Hart van Zuid'.xlsxxlsxMay 13, 2026 · 12 KB
Aanbestedingsfase.pdfpdfMay 13, 2026 · 23 KB

11Legal themes that may be relevant here

12Frequently asked questions

What mandatory selection requirements apply for participation?
The contractor must confirm participation in the market consultation on the date specified by the municipality and submit a technical documentation package describing experience with urban mobility projects and knowledge of sustainable parking system design.
Which suitability criteria must a bidder meet?
Bidders must provide proof of one to three years of experience in advising on or realizing comparable urban mobility hubs or project consultations, including references from previous assignments in the public sector regarding mobility or sustainable urban planning.
What is the intended function of the mobility hub?
The hub must address the parking requirement in the 'Hart van Zuid' area and provide space for shared mobility, sports opportunities, and meeting places, suitable for a high-density urban environment with more space for cyclists, pedestrians, and greenery.
How can questions about the market consultation be asked?
Questions can be asked anonymously via the 'ask a question' button on the Mercell platform. Questions will be answered as soon as possible via this platform.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159