National Market Consultation - Installation technology and building works adjustments signal halls VL posts
ProRail B.V. is conducting a market consultation for installation technology and building works adjustments in 12 traffic control (VL) posts distributed across the Netherlands. These 24/7 locations comprise approximately 179 workstations and must be converted into future-proof, Arbo-compliant workstations within the WerkPLEKbeleving Programme. The assignment requires multiple contracts and an optimal contract form. The consultation aims to gain insight into market options and determine the most suitable procurement procedure.
Works · Marktconsultatie · National procedure
01What is being requested
ProRail B.V. is conducting a market consultation for installation technology and building works adjustments in 12 traffic control (VL) posts distributed across the Netherlands. These 24/7 locations comprise approximately 179 workstations and must be converted into future-proof, Arbo-compliant workstations within the WerkPLEKbeleving Programme. The assignment requires multiple contracts and an optimal contract form. The consultation aims to gain insight into market options and determine the most suitable procurement procedure.
Within ProRail, we have 12 traffic control posts (VL posts). These VL posts are 24/7 locations and are distributed across the entire country with a total of approx. 179 workstations. The VL posts require a new future-proof, Arbo-compliant layout that matches the technological leap we will make in the coming years. ProRail intends to realize this through the WerkPLEKbeleving Programme. A component of this programme concerns the realization of a number of installation technology and building works adjustments in the signal halls. Please refer to the attached document for a more detailed descrip
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Likely competitors
04Tender documents
05Legal themes that may be relevant here
06Frequently asked questions
What is the purpose of this market consultation?
What does the intended assignment entail?
How many workstations are involved within the traffic control posts?
What kind of layout is intended for the VL posts?
Does ProRail wish to work with one or multiple parties?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159