PlannedWorksMarktconsultatie

Market Consultation Integral Construction Team Flores onderwijs

Stichting Flores onderwijs · Marktconsultatie · 1 lots · 415853
Type
Works
45000000 · Building works
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

Market consultation by Stichting Flores onderwijs for the renovation of three primary schools in Arnhem via an integral construction team. The goal is to collect input regarding the clustered approach and the design of the future tender.

Works · Marktconsultatie · National procedure

Complete timeline
Contracting authority
Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Building works
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

Renovation of three primary schools (De Binnenstad, De Sterrenkring and Heijenoord) in Arnhem via an integral construction team. The team is responsible for the design, preparation, and realization of the renovations, including potentially 4 years of maintenance to building and installation technical aspects.

Flores Onderwijs intends to put a contract for the renovation of three primary schools out to tender via a non-public European procurement (a clustered procurement). Prior to the publication of that tender, this market consultation is being organized. The purpose is to obtain substantive input from market parties, as well as to gauge their interest in the contract.

45000000Works
1Market Consultation Integral Construction Team Flores onderwijs

02Strategic insight

Strategic insight · AI analysis
Focus on demonstrating clustered experience and the synergy between design and execution. Ensure a strong substantiation of the core competencies, specifically in the areas of renovation, Healthy Schools, and construction team collaboration. Provide input on the procurement strategy, such as the choice between a 2-phase contract (UAV or UAV-GC) and the timing of signing the construction agreement.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The contract is a clustered procurement for three different schools.Important
An integral construction team (architect, advisors, and contractor) is sought, to be contracted via one contract for all three projects.Important
The market consultation is non-binding and has no influence on the final participation in the tender.Important
The intended core competencies should be considered minimum requirements.Important

04Can I take part?

Technical · 4
Core competency 1: Renovation (demonstrated by architect & contractor = 2 references)Technical
Core competency 2: Healthy Schools (demonstrated by installation advisor)Technical
Core competency 3: Construction team collaboration / managing a design team (reference provided by main contact person)Technical
Requirements applicable to all three core competencies: Utility construction, minimum size (≥ 900 m² GFA), completion within the last five years prior to the date of application.Technical

05Process & timeline

Publication of market consultation via TenderNed
11-maart-2026
Period for answering questions
12-maart-2026 tot 1 april
Deadline for returning the questionnaire via TenderNed
1-april-2026
Publication of answers (anonymized) via TenderNed
8-april-2026
Expected start of procurement process and publication of application documents
8-april-2026

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

07Likely competitors

#Likely bidderFitWins
1Reimert Bouw en Infrastructuur B.V.SME8817×
2Unica Installatietechniek B.V.SME8713×
3Fa. Gebr. Van der LeeUnknown8623×
4Facilicom Solutions B.V.SME8514×
5Constructif B.V.SME8412×
6Bertens Bouw B.V.SME8313×

08Tender documents

TN575953 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20260313135154pdfMar 13, 2026 · 179 KB
TN575953 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20260311172727pdfMar 11, 2026 · 173 KB
vragenformulier marktconsultatiedocxMar 11, 2026 · 26 KB
Bouwteam voor geclusterde projectaanpakpdfMar 11, 2026 · 1463 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the composition of the desired integral construction team?
The team consists of an architect, advisors, and a contractor, who are selected and contracted simultaneously via one contract for all three renovation projects.
What are the main objectives of the renovation projects?
The focus is on realizing future-proof buildings with a healthy indoor environment, flexibility, and accessibility, including sustainable improvements and green, movement-friendly schoolyards.
How will the contract for the three schools be executed?
A clustered approach has been chosen in which the schools De Binnenstad, De Sterrenkring, and Heijenoord collectively form part of one integral total assignment to promote synergy and quality.
What is the purpose of the consultation?
The consultation serves to collect substantive input from market parties for the design of the tender and to gauge interest in the contract.
Which phases are covered by the construction team?
The construction team is responsible for the design, the preparation and, after price alignment and the conclusion of the construction agreement, the realization of the renovation.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159