Market consultation regarding the realization, operation, and maintenance of a solar park along the A37 between Hoogeveen and the German border.

Works · Marktconsultatie · National procedure

Contracting authority
Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

The project concerns the realization and operation of a solar park along the A37 over a section of 42 km, including a maintenance obligation of 30 years for the verges and junctions.

This market consultation is intended to prepare for the tender procedure of the project ‘Drentse Zonneroute A37’, to find a suitable future operator of a solar park along national highway A37. The start of this tender procedure is anticipated for Q4 2025/Q1 2026. The market consultation has been organized by the joint initiators of the project, namely: the Provincie Drenthe, the municipalities of Hoogeveen, Emmen and Coevorden, the grid operators Enexis B.V. and N.V. RENDO, the Rijksvastgoedbedrijf (RVB), Rijkswaterstaat (RWS) and the Rijksdienst voor Ondernemend Nederland (RVO).

45300000Works
1Market Consultation Drentse Zonneroute A37

02Strategic insight

Strategic insight · AI analysis
Prepare for a complex assignment where technical execution and landscape integration converge. Ensure a strong focus on local ownership and participation aspects as requested by the energy umbrella organization. Anticipate the strict realization obligation by mapping out risks regarding permits and grid capacity at an early stage.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The operator receives a maintenance obligation for 30 years for the entire road except for the paving.Important
A realization obligation applies, whereby cherry picking of components is not permitted.Important
The design must comply with the aesthetic quality plan and the assessment by the welstandscommissie.Important
The grid connection is dependent on the realization of substations by grid operators.Important
There is a risk regarding financial feasibility due to the stated aesthetic requirements and market conditions.Important

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME9677×
2KWS Infra B.V.SME9092×
3Heijmans Infra B.V.SME8965×
4Boskalis Nederland B.V.SME8769×
5Van Gelder BVSME8553×
6Heijmans Utiliteit B.V.SME8227×

06Tender documents

2025 - Verslag marktconsultatie Drentse zonneroute A37 - 2025 v2pdfApr 7, 2025 · 14168 KB
2023 - Verslag marktconsultatie gekleurde PV panelen - Drentse Zonneroute A37 2023pdfMar 31, 2025 · 813 KB
2022 - Verslag marktconsultatie Drentse zonneroute A37 2022pdfMar 31, 2025 · 739 KB
2025 - Verslag marktconsultatie Drentse zonneroute A37 - 2025pdfMar 31, 2025 · 14169 KB
Bijlage 2 Marktconsultatie Drentse Zonneroute A37 - Technische randvoorwaarden RijkswaterstaatpdfFeb 5, 2025 · 61 KB
TN510007 - EF04 Vooraankondiging die alleen ter informatie wordt gebruikt - algemene richtlijn 20250205172503pdfFeb 5, 2025 · 5 KB
Marktconsultatiedocument Drentse Zonneroute A37pdfFeb 5, 2025 · 662 KB
Bijlage 3 Aanmeldformulier - Marktconsultatie Drentse Zonneroute A37docxFeb 5, 2025 · 14 KB
Bijlage 1 Formulier vragen en antwoorden - Marktconsultatie Zonneroute A37docxFeb 5, 2025 · 33 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the purpose of the Drentse Zonneroute A37 project?
The project investigates the possibilities for solar energy along a section of 42 km between Hoogeveen and the German border, where the wide median, side verges, exits, and junctions managed by Rijkswaterstaat are used.
How much solar energy can be generated on the A37 section?
It is expected that more than 176 megawatts of solar energy can be generated on the A37 section.
When is the tender procedure for the operation of the solar park expected?
The start of the tender procedure to find a suitable operator is anticipated for the fourth quarter of 2025 or the first quarter of 2026.
Which spatial frameworks apply to the Drentse Zonneroute A37?
To make the Drentse Zonneroute A37 spatially possible, a Provinciaal Inpassingsplan (PIP) has been drawn up, which was adopted by the Provinciale Staten on April 14, 2022.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159