PlannedSuppliesEuropean

Market consultation: Temporary, flexible grid congestion solutions on water

Havenbedrijf Rotterdam · 1 lots · 427224
Type
Supplies
09310000 · Electricity
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This concerns a market consultation by Havenbedrijf Rotterdam aimed at gaining insight into flexible solutions for grid congestion on water. The objective is to explore solution directions, providers, and cost structures without participation granting any rights to a future contract. For market parties, this is a crucial phase to influence the final specifications.

Supplies · European procedure

European
Contracting authority
Havenbedrijf Rotterdam
Zuid-Holland
Contract type
Supplies
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Electricity
Location
Rotterdam, Zuid-Holland
CharacteristicsCPV 09SuppliesEU tenderElectricityCongestionGrid solutions

01What is being requested

This concerns a market consultation by Havenbedrijf Rotterdam aimed at gaining insight into flexible solutions for grid congestion on water. The objective is to explore solution directions, providers, and cost structures without participation granting any rights to a future contract. For market parties, this is a crucial phase to influence the final specifications.

The generic objective of a market consultation is to gain insight into solution directions offered by market parties for the requirements of HbR. It is intended to gain insight into feasible solution directions; gain insight into potential solution providers; and compare cost structures (indicative). Based on the insights obtained, HbR will then take follow-up steps, which may consist of a selection of promising variants, refining the requirements and/or initiating a procurement procedure. The decision of whether and how HbR wishes to proceed is entirely at the discretion of HbR. Participati

09310000Supplies
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1Sweco Nederland B.V. SME10070×
2Witteveen+Bos Raadgevende ingenieurs B.V.SME10063×
3Arcadis Nederland B.V.SME98113×
4Haskoning Nederland B.V.SME98100×
5Antea Nederland BVSME9760×
6Tauw bvSME9443×

05Tender documents

Welkom en instructie Welcome and instruction.pdfpdfJun 3, 2026 · 61 KB
20260526 marktconsultatie netcongestieoplossing op water.pdfpdfJun 3, 2026 · 603 KB
Beschrijving.pdfpdfJun 3, 2026 · 53 KB
Beantwoording vragen marktconsultatie Answers to questions marketconsultation.pdfpdfJun 3, 2026 · 46 KB
Algemene bedrijfsinformatie General information.pdfpdfJun 3, 2026 · 53 KB
Bijlagen Attachments.pdfpdfJun 3, 2026 · 44 KB
Marktconsultatie.pdfpdfJun 3, 2026 · 33 KB
20260528 marketconsultation grid congestion solutions on water.pdfpdfJun 3, 2026 · 647 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the purpose of this market consultation?
The purpose is to gain insight into feasible solution directions, potential providers, and to compare indicative cost structures for flexible solutions regarding grid congestion on water.
Does participation in the consultation grant the right to participate in a future contract?
No, participation in this market consultation is non-binding and in no way leads to rights in the subsequent process or the final procurement procedure.
How will the future contract be determined?
Based on the insights obtained, the contracting authority may decide on a selection of promising variants, refining the requirements, or initiating a new procurement procedure.
Is participation in the consultation mandatory?
No, participation in the consultation is voluntary.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 300K
median
€ 691K
p75
€ 2,0 mln
deze opdracht

Gegunde waarden in CPV 09 · leveringen n=226