ClosedWorksEuropeanRestrictedGreen

Mainstation Schiphol South East 150/20kV

Schiphol Nederland BV · Restricted · 1 lots · 317447
Type
Works
45000000
Estimated value
€ 35M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Schiphol Nederland BV requires a new 150/20 kV high-voltage substation, Mainstation Schiphol South East, to meet the increasing demand for electricity resulting from the ambition to operate completely emission-free by 2030. The current network does not meet future capacity requirements, making an expansion necessary. The tender focuses on the design, construction, and connection of the substation within the Masterplan Power Grid (MPG) 2060. The assignment requires a technically high-quality, reliable, and future-proof system, including integration with existing infrastructure, safety and environmental standards, and clear planning and cost control. The procedure is non-public, meaning only selected suppliers will be invited to submit a proposal. The focus lies on innovation, sustainability, and minimizing the ecological footprint.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
€35,000,000
estimated value
Submission deadline
Ongoing
23:59
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPhigh-voltage substationSchiphol150/20kV

01What is being requested

Schiphol Nederland BV requires a new 150/20 kV high-voltage substation, Mainstation Schiphol South East, to meet the increasing demand for electricity resulting from the ambition to operate completely emission-free by 2030. The current network does not meet future capacity requirements, making an expansion necessary. The tender focuses on the design, construction, and connection of the substation within the Masterplan Power Grid (MPG) 2060. The assignment requires a technically high-quality, reliable, and future-proof system, including integration with existing infrastructure, safety and environmental standards, and clear planning and cost control. The procedure is non-public, meaning only selected suppliers will be invited to submit a proposal. The focus lies on innovation, sustainability, and minimizing the ecological footprint.

Following the Paris Agreement, SNBV has developed a vision to be emission-free with its own airport activities by 2030. To realize these ambitions, the use of natural gas and fossil fuels will be phased out, and a transition to electrically driven transport and equipment will be made as much as possible. Consequently, the demand for electricity at Schiphol will increase. To ensure that the electricity network is future-proof and can meet the demand of all connected parties, Schiphol has drafted the Masterplan Power Grid (MPG) 2060. It is because of this rapidly growing demand for electricity

45000000€ 35MWorks
1Mainstation Schiphol South East 150/20kV€35,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€35,000,000

04Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9373×
2BAM Infra B.V.SME9377×
3Anton Rail & Infra B.V.SME9221×
4VolkerRail Nederland B.V.SME9230×
5Croonwolter&dros B.V.SME9125×
6Heijmans Utiliteit B.V.SME9027×

05Legal themes that may be relevant here

06Frequently asked questions

In which strategic vision is this project included?
The expansion of the electricity network and the construction of this high-voltage substation are part of the Masterplan Power Grid (MPG) 2060, which was drafted to ensure the future capacity requirements of the Schiphol power grid.
What is the focus regarding the technical execution of the assignment?
The assignment focuses on the design, construction, and connection of the substation. Emphasis is placed on a technically high-quality, reliable, and future-proof system that is integrated with the existing infrastructure and complies with safety and environmental standards.

Automatically compiled from the official tender data and documents.