LIFE19 MIBA FILLER Pilot: Dryer System
Blue Phoenix Group is organizing an open tender for the supply of a drying plant for the LIFE19 MIBA Filler Pilot project. The objective is to demonstrate a climate change mitigation technology that replaces cement with a low-carbon binder. The EU is subsidizing the first demonstration plant (demo phase I), which will later be scaled up to a full demonstration (demo phase II). The tender invites companies to submit quotations for, among other things, the drying plant, installation, commissioning, training, and aftercare. The supplier must meet the technical specifications of the lab-scale process, integrate with the existing process flow, and comply with EU standards for emissions and energy efficiency.
Supplies · Open · National procedure
01What is being requested
Blue Phoenix Group is organizing an open tender for the supply of a drying plant for the LIFE19 MIBA Filler Pilot project. The objective is to demonstrate a climate change mitigation technology that replaces cement with a low-carbon binder. The EU is subsidizing the first demonstration plant (demo phase I), which will later be scaled up to a full demonstration (demo phase II). The tender invites companies to submit quotations for, among other things, the drying plant, installation, commissioning, training, and aftercare. The supplier must meet the technical specifications of the lab-scale process, integrate with the existing process flow, and comply with EU standards for emissions and energy efficiency.
This project aims to demonstrate a breakthrough climate-change mitigation technology for the concrete industry by replacing cement with a low-carbon binder. The EU is subsidizing the first demonstration plant under the project name LIFE MIBA Filler. The laboratory-scale research has resulted in a process flow diagram which we want to upscale in this MIBA Filler pilot plant (demo phase I) before having a full-scale demonstration plant (demo phase II). Hereto we invite companies to submit their quotations for amongst others following items.
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
03Likely competitors
04Tender documents
05Legal themes that may be relevant here
06Frequently asked questions
What is the objective of the LIFE19 MIBA FILLER Pilot project?
What is the scope of the requested supplies for the drying system?
In which phases is the LIFE MIBA Filler project carried out?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 300K
€ 800K
€ 4,0 mln
Gegunde waarden in CPV 42 · leveringen n=273