LIFE19 MIBA FILLER Pilot: Dryer Gas Treatment system 500+
Blue Phoenix Group is seeking suppliers for a pilot plant of a groundbreaking climate change mitigation technology for the concrete industry. The technology replaces cement with a low-carbon binder, known as the MIBA Filler, and is funded by the EU. The objective is to upscale a laboratory flow diagram to a pilot plant, including a dryer gas treatment system of 500+ (units). The tender is public and focuses on the supply of the required equipment, installation, testing, and documentation. Suppliers must demonstrate experience with industrial installations, comply with EU standards, and be able to provide a clear timeline for the demonstration. The pilot will serve as a basis for a full-scale up, validating performance, emission reduction, and economic feasibility.
Supplies · Open · National procedure · SME-friendly
01What is being requested
Blue Phoenix Group is seeking suppliers for a pilot plant of a groundbreaking climate change mitigation technology for the concrete industry. The technology replaces cement with a low-carbon binder, known as the MIBA Filler, and is funded by the EU. The objective is to upscale a laboratory flow diagram to a pilot plant, including a dryer gas treatment system of 500+ (units). The tender is public and focuses on the supply of the required equipment, installation, testing, and documentation. Suppliers must demonstrate experience with industrial installations, comply with EU standards, and be able to provide a clear timeline for the demonstration. The pilot will serve as a basis for a full-scale up, validating performance, emission reduction, and economic feasibility.
This project aims to demonstrate a breakthrough climate-change mitigation technology for the concrete industry by replacing cement with a low-carbon binder. The EU is subsidizing the first demonstration plant under the project name LIFE MIBA Filler. The laboratory-scale research has resulted in a process flow diagram which we want to upscale in this MIBA Filler pilot plant before having a full-scale plant. Hereto we invite companies to submit their quotations for amongst others following items.
02Breakdown by lot
Per-lot values not published — bars show only the lot breakdown.
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the objective of the LIFE19 MIBA FILLER Pilot project?
What is the scope of the requested supplies for the pilot plant?
How is the development of the MIBA Filler pilot plant funded?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 300K
€ 800K
€ 4,0 mln
Gegunde waarden in CPV 42 · leveringen n=273