AwardedSuppliesEuropeanOpen

Supply of Diffuse and Pumped 4-Gas Meters including maintenance stations

Veiligheidsregio Fryslân · Open · 1 lots · 371443
Type
Supplies
35000000
Estimated value
€ 210K
estimated
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high

Veiligheidsregio Fryslân is looking for a supplier for the supply of 4-gas meters and maintenance stations via a framework agreement. The contract also includes the supply of accessories, parts and support for maintenance and training.

Supplies · Open · European procedure

European
Contracting authority
Contract type
Supplies
Open
Estimated value
€210,000
estimated value
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 35SuppliesEU tender

01What is being requested

Supply of Diffuse and Pumped 4-Gas Meters including maintenance stations, accessories, parts, warranty and repairs via a framework agreement for a maximum duration of six years.

The contracting authority is initiating this tender with the objective of entering into a framework agreement with one (1) contractor for the supply of Diffuse and Pumped 4-Gas Meters, with four measuring cells LEL, O2, CO and H2S, including maintenance stations for a maximum duration of six (6) years. The supply of accessories, parts, warranty and any repairs during the framework agreement also falls under this contract.

35000000€ 210KSupplies
1Supply of Diffuse and Pumped 4-Gas Meters including maintenance stations

02Outcome

Awarded

Dräger Nederland B.V.

Bidders
6

03Strategic insight

Strategic insight · AI analysis
Ensure a complete Dutch submission in accordance with the checklist. Pay close attention to the practical test within the quality assessment. Submit the tender on time via the digital portal.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 4
Bids submitted under <strong style='color:red;'>conditions will not be accepted and will lead to exclusion.Important
Unsolicited changes to the <strong style='color:red;'>ordering of documents may lead to exclusion.Important
The tender must remain valid for <strong style='color:red;'>three months after the closing date.Important
Communication must take place <strong style='color:red;'>exclusively via TenderNed.Important

05Can I take part?

Financial · 1
financial and economic standingFinancial
Technical · 1
technical and professional abilityTechnical
Professional capability · 1
Professional competenceProfessional capability

06Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

07Award criteria

G2 – Qualityweight n/a

Assessment of the quality, including a practical test.

G1 - Priceweight n/a

Assessment of the price based on the completed price sheet.

08Value in context

€210,000

09Bidders in this segment

#Likely bidderFitWins
1Hobrand B.V. / Holugt-SauerSME9320×
2Dräger Nederland B.V.SME9315×
3Kenbri Fire Fighting B.V.SME72
4MSA Nederland B.V.SME69
57 Solutions B.V.SME67
6Draeger Nederland B.V.SME67

10Tender documents

TN515728 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250716142958pdfJul 17, 2025 · 11 KB
Bijlage 4 Prijzenblad_V3.0xlsxApr 16, 2025 · 41 KB
Bijlage 1 Programma van Eisen_V3.0xlsxApr 16, 2025 · 37 KB
2e Nota van inlichtingenxlsxApr 16, 2025 · 20 KB
1e Nota van inlichtingen_515728xlsxApr 8, 2025 · 27 KB
Bijlage 6 Verklaring omtrent Inschrijving_V2.0docxApr 8, 2025 · 220 KB
Offerteaanvraag EA 4-GasmeterspdfMar 20, 2025 · 428 KB
Bijlage 9 Verklaring OnderaannemingdocxMar 20, 2025 · 218 KB
Bijlage 2 ARIV 2018pdfMar 20, 2025 · 357 KB
uea_515728_20250312111833pdfMar 20, 2025 · 1505 KB
Bijlage 3 Concept RaamovereenkomstpdfMar 20, 2025 · 227 KB
Bijlage 7 KlachtenafhandelingpdfMar 20, 2025 · 48 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the scope of the contract regarding the gas meters?
The contract concerns the supply of diffuse and pumped 4-gas meters with four measuring cells: LEL, O2, CO and H2S, including the associated maintenance stations.
What is the maximum duration of the agreement to be concluded?
The contract is executed via a framework agreement with a maximum duration of six (6) years.
Which additional items fall under the framework agreement?
In addition to the gas meters and maintenance stations, the supply of accessories, parts, warranty and any repairs during the term of the framework agreement also falls under this contract.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 397K
median
€ 902K
p75
€ 1,8 mln
€ 210K

Gegunde waarden in CPV 35 · leveringen n=131