Supply and installation of the 150kV Gas insulated switchgear station (GIS) for Schiphol Zuidoost
Schiphol Nederland BV has opened a tender for the design, production, testing, transport, and commissioning of a 150 kV gas-insulated switchgear (GIS) station at the Schiphol-Zuidoost location. The contract includes full engineering, fabrication, Factory Acceptance Test (FAT), logistics from factory to construction site, horizontal and vertical on-site transport, installation, Site Acceptance Test (SAT), and final commissioning. The procedure is a competitive procedure with negotiation, allowing suppliers to submit a detailed bid and negotiate on price, delivery time, and technical specifications. The scope requires strict compliance with Dutch safety and quality standards, as well as integration with existing Schiphol infrastructure.
Supplies · Competitive procedure with negotiation · European procedure
01What is being requested
Schiphol Nederland BV has opened a tender for the design, production, testing, transport, and commissioning of a 150 kV gas-insulated switchgear (GIS) station at the Schiphol-Zuidoost location. The contract includes full engineering, fabrication, Factory Acceptance Test (FAT), logistics from factory to construction site, horizontal and vertical on-site transport, installation, Site Acceptance Test (SAT), and final commissioning. The procedure is a competitive procedure with negotiation, allowing suppliers to submit a detailed bid and negotiate on price, delivery time, and technical specifications. The scope requires strict compliance with Dutch safety and quality standards, as well as integration with existing Schiphol infrastructure.
Purpose of the tender: the Assignment/ContractnThis Invitation to Tender covers the following scope regarding the 150kV Gas insulated switchgear station:n- Design and production of the 150kV Gas insulated switchgear stationn- Factory Acceptance Test (FAT)n- Transport from factory to construction site (former Quick Parking Beechavenue)n- Supply and installation at the construction site (including horizontal and vertical on-site transport)n- Site Acceptance Test (SAT) and finally commissioning for operational use.nNThe assignment description
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
04Likely competitors
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the exact scope of the assignment for the 150kV Gas insulated switchgear station?
Which testing phases are included in the supply of the switchgear station?
What does the logistical component of this assignment entail?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 260K
€ 526K
€ 1,4 mln
Gegunde waarden in CPV 31 · leveringen n=168