AwardedSuppliesEuropeanRestricted

Supply and installation of solar panels + solar energy storage system

Gemeente Bergen op Zoom · Restricted · 1 lots · 360448
Type
Supplies
09331000
Estimated value
€ 950K
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Bergen op Zoom, via the housing corporation Stadlander, intends to select one contractor through a non-public procurement for the supply and installation of solar panels and a solar energy storage system on flats owned by Stadlander. The project is funded by SPUK subsidies from the Ministry of the Interior and Kingdom Relations, for which the municipality has an accountability obligation. The contractor must deliver the installations turn-key no later than 31 October 2026, with a start date of 21 May 2025. The procurement requires a detailed risk analysis, compliance with the amended Public Procurement Act 2012, and adherence to the SPUK conditions, including a maximum duration until 31 December 2026. The assignment focuses on reducing energy costs for tenants facing energy poverty, with the municipality and Stadlander acting as the contracting authority.

Supplies · Restricted · European procedure

European
Contracting authority
Contract type
Supplies
Restricted
Estimated value
€950,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 09SuppliesEU tendersolar panelssolar energy storage systemSPUK

01What is being requested

The Municipality of Bergen op Zoom, via the housing corporation Stadlander, intends to select one contractor through a non-public procurement for the supply and installation of solar panels and a solar energy storage system on flats owned by Stadlander. The project is funded by SPUK subsidies from the Ministry of the Interior and Kingdom Relations, for which the municipality has an accountability obligation. The contractor must deliver the installations turn-key no later than 31 October 2026, with a start date of 21 May 2025. The procurement requires a detailed risk analysis, compliance with the amended Public Procurement Act 2012, and adherence to the SPUK conditions, including a maximum duration until 31 December 2026. The assignment focuses on reducing energy costs for tenants facing energy poverty, with the municipality and Stadlander acting as the contracting authority.

In mid-Q1 '24, Stadlander was requested by the Municipality of Bergen op Zoom to be involved in the project to combat energy poverty. Among the residents of Bergen op Zoom facing energy poverty are also tenants of the housing corporation Stadlander.  <br><br>The Municipality of Bergen op Zoom aims to support these residents and has decided, in cooperation with Stadlander, to equip a number of flats owned by Stadlander with solar panels + solar energy storage systems. For this purpose, so-called SPUK energy poverty subsidies are being utilized. These SPUK subsidies have been granted to the Mun

09331000€ 950KSupplies
1Supply and installation of solar panels + solar energy storage system€950,000

02Outcome

Awarded

Innova Duurzaam

Award value
€950,000
vs. estimate
0%

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

€950,000

05Bidders in this segment

#Likely bidderFitWins
1Eneco Zakelijk B.V.SME9021×
2De Groene Stroomfabriek N.V.SME9019×
3E2-EnergieUnknown8510×
4Innova DuurzaamUnknown80
5Gazprom Marketing & Trading Retail LimitedUnknown8016×
6De Vrije Energie Producent B.V.SME7913×

06Legal themes that may be relevant here

07Frequently asked questions

When must the installations be delivered turn-key?
The supply and installation of the solar panels and the solar energy storage system must be delivered ready for use (turn-key) no later than 31 October 2026. This date also applies to the settlement.
What specific requirement is made regarding the risk analysis?
During the tender phase, the contractor is requested to provide a detailed risk analysis.
What is the maximum duration for the execution and settlement of the project?
Due to the SPUK subsidy, the project must be executed and settled no later than 31 December 2026.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 300K
median
€ 691K
p75
€ 2,0 mln
€ 950K

Gegunde waarden in CPV 09 · leveringen n=226