AwardedSuppliesEuropeanOpenGreen

Supply and installation of PV panels RDW

RDW · Open · 1 lots · 317321
Type
Supplies
09330000
Estimated value
€ 1,60M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The RDW is seeking a partner for the design, supply, installation, and commissioning of PV panels at 13 inspection locations. The assignment also includes fault maintenance in the first year, maintenance in the final month of the warranty period, and close communication with the internal installer. The RDW emphasizes short lead times, a single contractor, and clear lines of communication. Modifications to the main distribution system, the installation of a gross production meter, and fault monitoring are out of scope. The tender is open and aimed at achieving sustainability goals by reducing fossil fuel consumption.

Supplies · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Supplies
Open
Estimated value
€1,600,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 09SuppliesEU tenderGreen / SPPPV panelssolar installationRDW

01What is being requested

The RDW is seeking a partner for the design, supply, installation, and commissioning of PV panels at 13 inspection locations. The assignment also includes fault maintenance in the first year, maintenance in the final month of the warranty period, and close communication with the internal installer. The RDW emphasizes short lead times, a single contractor, and clear lines of communication. Modifications to the main distribution system, the installation of a gross production meter, and fault monitoring are out of scope. The tender is open and aimed at achieving sustainability goals by reducing fossil fuel consumption.

The assignment concerns the design, supply, installation, and commissioning of PV panels at 13 RDW inspection locations. It also includes fault maintenance within the first year, maintenance in the final month of the warranty period, and providing communication/coordination with the RDW's in-house installer. Out of scope: 1. Modifying the main distribution system; 2. Installing the gross production meter; 3. Fault monitoring. The reason for bringing this request to the market stems from the sustainability ambitions of the RDW. By installing PV panels at all RDW inspection locations, the RD

09330000€ 1,60MSupplies
1Supply and installation of PV panels RDW€1,600,000

02Outcome

Awarded

E2-Energy B.V.

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

€1,600,000

05Bidders in this segment

#Likely bidderFitWins
1Eneco Zakelijk B.V.SME8821×
2E2-EnergieUnknown8710×
3GP Groot brandstoffen en oliehandelUnknown8311×
4Innova DuurzaamUnknown82
5De Groene Stroomfabriek N.V.SME8219×
6SO Industrial B.V.SME79

06Legal themes that may be relevant here

07Frequently asked questions

What is the exact scope of the assignment?
The assignment includes the design, supply, installation, and commissioning of PV panels at 13 inspection locations, including fault maintenance in the first year and maintenance in the final month of the warranty period.
Which activities are out of scope for this assignment?
Modifying the main distribution system, installing the gross production meter, and fault monitoring are out of scope for this assignment.
What operational requirements must the contractor meet?
The contractor must be able to guarantee short lead times for the installation and provide close communication/coordination with the RDW's in-house installer.
What is the purpose of installing the PV panels?
The installation of the PV panels at all inspection locations is intended to reduce the consumption of fossil fuels and contribute directly to climate goals.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 300K
median
€ 691K
p75
€ 2,0 mln
€ 1,6 mln

Gegunde waarden in CPV 09 · leveringen n=226