Delivery of flow measurement and commissioning

Evides N.V. · Open · 1 lots · 426450
Type
Supplies
38420000 · Instruments for measur
Estimated value
Not published
To deadline
23d
Jul 9, 2026 · 10:00
Knock-outs
3
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Caution — high thresholdconfidence high

This tender concerns the delivery and commissioning of flow measurement facilities for the new drinking water treatment plant De Wranghe of Evides N.V. The award will take place on the basis of the lowest price.

Supplies · Open · European procedure

European3 exclusion grounds
Contracting authority
Noord-Brabant
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
July 9, 2026
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Instruments for measuring flow, level and pressure of liquids and gases
Location
Kapelle, Noord-Brabant
CharacteristicsCPV 38SuppliesEU tenderFlow measurementDrinking water treatmentInstrumentation

01What is being requested

Delivery of flow measurement facilities for the new drinking water treatment plant De Wranghe near Kapelle to reliably and accurately regulate and monitor water flows.

To be able to meet the future demand for supplying sufficient drinking water to a part of southwest Netherlands, a new drinking water treatment plant (dwz) named DWZ Wranghe is being realized near Kapelle. Evides wishes to realize the necessary flow measurement facilities for the new drinking water treatment plant De Wranghe in order to be able to reliably and accurately regulate and monitor the water flows. For this purpose, flow measurement systems are required as specified in the attachments. In broad terms, the subject of the contract includes: Delivery and setting up of flow measurement

38420000Supplies
1Delivery of flow measurement and commissioning€1

02Strategic insight

Strategic insight · AI analysis
Ensure a legally valid signed Uniform European Procurement Document to prevent exclusion. Check whether the insurance coverage and the reference contract exactly meet the stated threshold values. Ensure that all supporting documents, such as the tax authorities statement and the certificate of conduct, fall within the applicable time limits.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The UEA must not be retyped, supplemented or modified to prevent exclusion.Important
In the case of a combination, each participant must individually submit the supporting documents for suitability.Important
The total tender sum must exactly match the completed price sheet excluding VAT.Important
Supporting documents for references must be submitted in PDF format and must not be zipped.Important

04Can I take part?

Financial · 2
Business liability insurance (AVB) with a coverage of at least € 2,500,000.00 per event or series of related events.Financial
Continuity of the company must be guaranteed during the term of the contract, including possible extensions; for audit-liable bidders, the most recent audit statement may not contain a negative continuity paragraph.Financial
Technical · 4
One relevant reference for the scope of delivery of at least 150 flow measurement instruments with measurement principles electromagnetic, ultrasonic and vortex, for diameters from DN600 and flows from 1750 m3/h.Technical
Possession of ISO 9001 quality management system or an equivalent system.Technical
Responsible and managerial personnel must be proficient in the Dutch language, both spoken and written.Technical
Employees performing work on the construction site and/or production location must be VCA or VOL VCA certified.Technical
Exclusion ground · 3
Registration in the commercial register with an extract that is no older than 6 months and which shows the signing authority.Exclusion ground
Possession of a Statement of Tax and Social Security Contributions that is no older than 6 months.Exclusion ground
Possession of a Certificate of Conduct for Tendering (Gedragsverklaring Aanbesteden) that is no older than 2 years.Exclusion ground

05Exclusion grounds

Exclusion grounds (3)
  • Registration in the commercial register with an extract that is no older than 6 months and which shows the signing authority.
  • Possession of a Statement of Tax and Social Security Contributions that is no older than 6 months.
  • Possession of a Certificate of Conduct for Tendering (Gedragsverklaring Aanbesteden) that is no older than 2 years.

06Award criteria

Priceweight n/a

The total tender sum must exactly match the completed price sheet excluding VAT.

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

08Likely competitors

#Likely bidderFitWins
1Xylem Water Solutions Nederland B.V.SME70
2Nortek Oceanografische Instrumenten en Diensten B.V.SME67
3Taxameter Centrale B.V.SME4814×
4Waters Chromatography B.V.SME4312×
5Bruker Nederland B.V.SME4313×
6Agilent Technologies Netherlands B.V.SME4010×

09Tender documents

Beschrijving.pdfpdfMay 28, 2026 · 29 KB
UEA Evides N.V..pdfpdfMay 28, 2026 · 81 KB
Geschiktheidseisen.pdfpdfMay 28, 2026 · 48 KB
Uitsluitingsgronden.pdfpdfMay 28, 2026 · 40 KB
Aanbestedingsfase.pdfpdfMay 28, 2026 · 22 KB
Gunningscriterium Prijs.pdfpdfMay 28, 2026 · 25 KB
Algemeen.pdfpdfMay 28, 2026 · 41 KB
Welkom, Aanbestedingsleidraad en instructie.pdfpdfMay 28, 2026 · 29 KB
Voorwaarden.pdfpdfMay 28, 2026 · 37 KB
Minimumeisen.pdfpdfMay 28, 2026 · 25 KB

10Legal themes that may be relevant here

11Frequently asked questions

What are the logistical requirements for the delivery of the equipment?
The equipment must be delivered DDP to the location. The supplier is responsible for unloading at the location, as no equipment is available there. The delivery must be made with sturdy protection, such as pallets.
How is the delivery of the flow measurement facilities planned?
The delivery takes place in three phases: Tertiary treatment and chemistry (approx. 2/3) in Q2 2028, the high-pressure pump station (<5%) in Q3 2028, and the pre-treatment (approx. 1/3) in Q2 2029.
Which technical specifications must the instruments meet?
Certain meters must have the MID designation for accurate monitoring of water flows. The instruments FIT-68901 and FIT-68902 will be placed underground and must therefore be supplied by the supplier as waterproof and ready for underground application.
What does the contract entail regarding installation and commissioning?
The installation and connection of the measurements will be carried out by the contracting authority. After installation, the supplier must return for the setting and commissioning of the instruments. Communication on site takes place in the Dutch language.
What is the availability of spare parts after delivery?
For the delivered equipment, the supplier must guarantee that spare parts are available for a period of 10 years.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 300K
median
€ 515K
p75
€ 1,7 mln
deze opdracht

Gegunde waarden in CPV 38 · leveringen n=331