ClosedSuppliesEuropeanOpen

Supply and planting of flower bulbs

Gemeente Harderwijk · Open · 1 lots · 236829
Type
Supplies
03451200
Estimated value
€ 270K
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Harderwijk wishes to enter into a framework agreement with three contractors for the supply and planting of flower bulbs. The procurement concerns an open procedure without a CPV code, aimed at the supply of various flower bulbs for municipal parks, squares, and public spaces. The contractors must be able to deliver the requested quantities on time, plant the bulbs correctly, and provide aftercare. Suppliers are expected to have experience with large-scale horticultural deliveries, possess the necessary permits and quality certificates, and be capable of organizing the logistics regarding transport and storage. The municipality emphasizes sustainability, local production, and minimizing the ecological footprint. The framework agreement offers flexibility regarding volumes and delivery times, allowing the municipality to adjust the flower supply according to seasonal and event needs.

Supplies · Open · European procedure

European
Contracting authority
Contract type
Supplies
Open
Estimated value
€270,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Harderwijk
CharacteristicsCPV 03SuppliesEU tenderflower bulbsframework agreementsupply

01What is being requested

The Municipality of Harderwijk wishes to enter into a framework agreement with three contractors for the supply and planting of flower bulbs. The procurement concerns an open procedure without a CPV code, aimed at the supply of various flower bulbs for municipal parks, squares, and public spaces. The contractors must be able to deliver the requested quantities on time, plant the bulbs correctly, and provide aftercare. Suppliers are expected to have experience with large-scale horticultural deliveries, possess the necessary permits and quality certificates, and be capable of organizing the logistics regarding transport and storage. The municipality emphasizes sustainability, local production, and minimizing the ecological footprint. The framework agreement offers flexibility regarding volumes and delivery times, allowing the municipality to adjust the flower supply according to seasonal and event needs.

The contracting authority wishes to enter into a framework agreement with 3 contractors.

03451200€ 270KSupplies
1Lot 1€270,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€270,000

04Likely competitors

#Likely bidderFitWins
1Boot & Dart Boomkwekerijen B.V.SME10055×
2Boomkwekerijen M van den Oever & Zn BVSME9720×
3B.V. Boomkwekerij Udenhout.SME9417×
4Handelskwekerij Piet van ´t Wout B.V.SME9415×
5Boomkwekerij Ebben B.V.SME9016×
6Jac. Uittenbogaard & Zonen B.V.SME81

05Tender documents

TN326823 - SF02 Aankondiging van een opdracht 20210829123037pdfAug 29, 2021 · 30 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the intended framework agreement?
The municipality wishes to enter into a framework agreement with 3 contractors for the supply and planting of flower bulbs.
What does the assignment entail for the suppliers?
The assignment includes the supply of various flower bulbs for municipal parks, squares, and public spaces, including the correct planting of the bulbs and providing aftercare.
What logistical requirements are imposed on the contractors?
Contractors must be able to deliver the requested quantities on time and independently organize the logistics regarding transport and storage.
Which aspects does the municipality emphasize during execution?
The municipality emphasizes sustainability, local production, and minimizing the ecological footprint.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 145K
median
€ 360K
p75
€ 800K
€ 270K

Gegunde waarden in CPV 03 · leveringen n=190