ClosedWorksEuropeanCompetitive procedure with negotiation

Life-Extending Maintenance 2024 onwards

Havenbedrijf Rotterdam NV · Competitive procedure with negotiation · 1 lots · 310370
Type
Works
45233141
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Havenbedrijf Rotterdam NV (HbR) applies the nationally recognized CROW methodology for road management. Based on annual inspections and a Multi-Year Maintenance Plan (MJOP), a set of road sections is determined on which Life-Extending Maintenance (LVO) must be performed. LVO means that the route remains maintenance-free for the next 10 years. In the first year, seven sub-projects are planned, each with its own maintenance measure – from foundation work to the replacement of surface or intermediate layers. The project is executed via a multi-year Bouwteamovereenkomst. The procedure is a competitive procedure with negotiation, in which the contractor must submit a plan that complies with CROW standards, the 10-year guarantee, and the specific works per sub-project.

Works · Competitive procedure with negotiation · European procedure

European
Contracting authority
Zuid-Holland
Contract type
Works
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Rotterdam, Zuid-Holland
CharacteristicsCPV 45WorksEU tenderLife-Extending MaintenanceCROWMJOP

01What is being requested

Havenbedrijf Rotterdam NV (HbR) applies the nationally recognized CROW methodology for road management. Based on annual inspections and a Multi-Year Maintenance Plan (MJOP), a set of road sections is determined on which Life-Extending Maintenance (LVO) must be performed. LVO means that the route remains maintenance-free for the next 10 years. In the first year, seven sub-projects are planned, each with its own maintenance measure – from foundation work to the replacement of surface or intermediate layers. The project is executed via a multi-year Bouwteamovereenkomst. The procedure is a competitive procedure with negotiation, in which the contractor must submit a plan that complies with CROW standards, the 10-year guarantee, and the specific works per sub-project.

Within HbR, the nationally recognized CROW methodology for road management is followed. According to this methodology, a Multi-Year Maintenance Plan (MJOP) is established based on (annual) inspections and measurements, from which a set of road sections is determined annually where Life-Extending Maintenance (LVO) must be performed. For all sub-projects, a measure has been determined which guarantees that this route will be maintenance-free for the next 10 years. This is also what HbR understands by LVO. This project concerns the multi-year execution of maintenance on sub-locations (seven in th

45233141Works
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2BAM Infra B.V.SME9877×
3Boskalis Nederland B.V.SME9870×
4Heijmans Infra B.V.SME9865×
5D. van der Steen B.V.SME9831×
6De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9826×

05Legal themes that may be relevant here

06Frequently asked questions

What is meant by Life-Extending Maintenance (LVO) within this assignment?
LVO means that the implemented maintenance measure guarantees that the relevant route remains maintenance-free for the next 10 years.
Which methodology is used for road management?
The nationally recognized CROW methodology for road management is used. Based on annual inspections and measurements, a Multi-Year Maintenance Plan (MJOP) is established.
In what way is the execution of the works organized?
The project is executed from the first year by means of a multi-year Bouwteamovereenkomst.
What is the scope of the works per sub-project?
The scope of maintenance differs per sub-project; the works vary from maintenance down to the foundation to the replacement of a surface layer or the local replacement of an intermediate layer.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159