National - Framework Agreement Methodology Conserving steel bridges 2024 (2)

ProRail B.V. · Restricted · 4 lots · 333466
Type
Works
45442100
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high

This assignment concerns the execution of conservation works on steel bridges for ProRail, divided across various regions. The award takes place on the basis of the best price-quality ratio, whereby the CO2 performance ladder has a direct influence on the evaluation price.

Works · Restricted · National procedure · SME-friendly

SME-friendlySustainability counts
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
13:30
Scope
National
National procedure
Lots
4
4 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksSME-friendlyGreen / SPPframework agreement methodologyconservationsteel bridges

01What is being requested

The realization of conservation works of civil engineering structures, consisting of the pretreatment and painting of existing steel bridges.

ProRail intends to expand the framework agreement methodology 'Conservation works steel bridges' with a national procedure for the business units within ProRail. The methodology is briefly outlined in the attached letter (including appendices).

45442100Works
1Lot 1: Randstad Noord Region
2Lot 2: Randstad Zuid Region
3Lot 3: Zuid Region
4Lot 4: NoordOost Region

02Outcome

Awarded

Iris Industry Solutions NV

Bidders
9

03Breakdown by lot

Lot 1: Randstad Noord Regionn/a
Lot 2: Randstad Zuid Regionn/a
Lot 3: Zuid Regionn/a
Lot 4: NoordOost Regionn/a

Per-lot values not published — bars show only the lot breakdown.

04Strategic insight

Strategic insight · AI analysis
Focus on a high CO2 ambition level to maximize the fictitious discount on the tender sum. Ensure a correct substantiation of the tender sum within the budget in accordance with the UAV-gc.
Read automatically from the tender documents using AI. Always verify against the original documents.

05Points of attention

The evaluation price is calculated by deducting the fictitious discount of the CO2 performance ladder from the tender sum.
The tender sum must be substantiated in the budget.

06Award criteria

Sustainability: CO2 performance ladderweight n/a

The ambition level determines a fictitious discount percentage on the tender sum: step 5 is 10%, step 4 is 7%, step 3 is 4%, step 2 is 2% and step 1 is 1%.

Price (for UAV-gc)weight n/a

The bidder's sum is reduced by a fictitious discount based on the CO2 ambition level.

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Bidders in this segment

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9573×
2BAM Infra B.V.SME9377×
3Anton Rail & Infra B.V.SME9321×
4KWS Infra B.V.SME9292×
5Heijmans Infra B.V.SME9165×
6Dura Vermeer Infra Regionale Projecten BVSME9158×

09Tender documents

TN458354 - EF30 Aankondiging gegunde opdracht - sectorale richtlijn, standaardregeling 20240603142449pdfJun 3, 2024 · 62 KB
Bijlage 9 - Eigen Verklaring Sanctiepakket RuslanddocxMay 7, 2024 · 34 KB
TN458354 Publicatie TEDzipApr 19, 2024 · 2368 KB
TN458354 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20240419120125pdfApr 19, 2024 · 39 KB

10Legal themes that may be relevant here

11Frequently asked questions

What exactly does the assignment for the conservation works entail?
The assignment concerns the realization of conservation works on civil engineering structures. This specifically includes pretreatment for the purpose of painting and the painting of existing steel bridges.
In what way is the price evaluated in relation to sustainability?
The evaluation price is calculated based on the tender sum and a discount based on the CO2 performance ladder. The final award takes place on the basis of the best price-quality ratio.
What are the conditions for submitting the tender?
The bidder is obliged to bid on all lots.
What is the expected duration of the works per lot?
The estimated duration of the works runs from the start date on 27-05-2024 to the end date on 01-08-2026.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159