AwardedServicesEuropeanOpenGreen

Charging stations

Type
Services
65300000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high

This tender concerns the supply and management of charging stations for the Hoogheemraadschap van Schieland en de Krimpenerwaard under strict technical and liability requirements.

Services · Open · European procedure

Sustainability countsEuropean
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 65ServicesEU tenderGreen / SPPcharging stationselectrificationinstallation

01What is being requested

The contract concerns the supply, installation, and management of charging stations within a framework agreement for the Hoogheemraadschap van Schieland en de Krimpenerwaard.

HHKS wishes to enter into a Framework Agreement for the supply, installation, management, hosting, and maintenance of newly to be placed charging infrastructure and the management, hosting, and maintenance of the existing charging stations. Charging stations are required in connection with the electrification of the HHSK vehicle fleet.

65300000Services
1Charging stations

02Outcome

Awarded

Saman Groep B.V.

Bidders
3

03Strategic insight

Strategic insight · AI analysis
Ensure that all necessary costs for the realization are fully included in the price list. Take into account the strict requirements regarding liability and the mandatory response time for malfunctions. It is permitted to offer a new portal for management.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 8
A charging station with a deviating appearance is not permitted.Important
Offering a smarter alternative for load balancing is not permitted.Important
The liability in accordance with article 19 AWVODI-2018 is maintained.Important
The complete exclusion of indirect damage is not accepted.Important
All costs for the realization must be included in the price list.Important
No cost items may be invoiced that are not in the price list.Important
Works on the existing cabling do not fall within this framework agreement.Important
In case of malfunctions where the plug is stuck, the solution must take place within 2 hours.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

Economisch Meest Voordelige Inschrijvingweight n/a

The total price from the price list is used to determine the EMVI.

K1weight n/a

The planning must include when the contractor will perform the works for the installation manager.

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

08Bidders in this segment

#Likely bidderFitWins
1SPIE Nederland B.V.SME79
2Unica Installatietechniek B.V.SME73
3AXAL Power B.V.SME71
4Saman Groep BVSME71
5KenterUnknown68
6Heijmans Infra B.V.SME68

09Tender documents

TN499200 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250423125051pdfApr 24, 2025 · 12 KB
2025.01741 Nota van Inlichtingen 2 LaadpalenpdfFeb 6, 2025 · 66 KB
Bijlage C Maatvoering kast locatie de Kooi - NVI 2pdfFeb 6, 2025 · 466 KB
Bijlage A Voorbeelden verkeersborden elektrisch laden - NVI 1pdfJan 23, 2025 · 67 KB
Bijlage 2 Prijzenblad Laadpalen HHSK - NVI 1xlsxJan 23, 2025 · 31 KB
2025.00522 Nota van Inlichtingen 1 LaadpalenpdfJan 23, 2025 · 155 KB
Bijlage B Kwartierdata Gemaal de Kooi - NVI 1xlsxJan 23, 2025 · 650 KB
Bijlage 10 AWVODI-2018pdfDec 18, 2024 · 381 KB
Bijlage 4 Concept WachtkamerovereenkomstpdfDec 18, 2024 · 92 KB
Bijlage 12 VerwerkersovereenkomstpdfDec 18, 2024 · 173 KB
Bijlage 9 Huisregels overige zuiveringen en gemalenpdfDec 18, 2024 · 158 KB
Bijlage 3 Concept RaamovereenkomstpdfDec 18, 2024 · 156 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the scope of the framework agreement for the charging infrastructure?
The agreement includes the supply, installation, management, hosting, and maintenance of newly to be placed charging infrastructure, as well as the management, hosting, and maintenance of the existing charging stations to support the electrification of the vehicle fleet.
Is it possible to offer charging stations with a deviating appearance?
No, a charging station with a deviating appearance and/or the replacement of the current charging stations is not permitted. The charging stations must be the same or similar in appearance.
Are there specific requirements regarding the origin of the charging points or components?
HHSK has no preference or specific requirements regarding charging points and/or sub-components produced in the Netherlands and/or in Europe, provided that requirement 7.2 from the Program of Requirements is met.
Is offering alternative load balancing solutions permitted?
No, offering a smarter alternative for load balancing is not permitted in this tender; load balancing is sufficient.

Automatically compiled from the official tender data and documents.