Quay Wall HES Bulk Terminal Amsterdam
Havenbedrijf Amsterdam N.V. intends to replace and extend part of the HES quay in the Amsterdam port area. The works include the replacement of a 100-meter anchored combi-wall along the Westhaven and a 28-meter anchored combi-wall along the Sonhaven. The new structures must comply with HES standards, be safe for inland vessels, and be implemented in an environmentally friendly manner. The tender is public and aimed at the construction sector, with an emphasis on maritime infrastructure. Suppliers must have experience with anchored combi-walls, knowledge of port conditions, and the ability to deliver within the specified timelines. The contract requires precise planning, safety measures, and compliance with environmental and regulatory requirements. The tender can be found on Mercell, where additional documents and specifications are available.
Works · Open · European procedure
01What is being requested
Havenbedrijf Amsterdam N.V. intends to replace and extend part of the HES quay in the Amsterdam port area. The works include the replacement of a 100-meter anchored combi-wall along the Westhaven and a 28-meter anchored combi-wall along the Sonhaven. The new structures must comply with HES standards, be safe for inland vessels, and be implemented in an environmentally friendly manner. The tender is public and aimed at the construction sector, with an emphasis on maritime infrastructure. Suppliers must have experience with anchored combi-walls, knowledge of port conditions, and the ability to deliver within the specified timelines. The contract requires precise planning, safety measures, and compliance with environmental and regulatory requirements. The tender can be found on Mercell, where additional documents and specifications are available.
In the Amsterdam port area, Havenbedrijf Amsterdam plans to partially replace and partially extend the HES quay for the mooring of inland vessels. The quay to be replaced and extended is situated at the corner of the Westhaven and the Sonhaven and consists of the following components: - Quay along Westhaven consisting of an anchored combi-wall of approx. 100 m - Quay along the Sonhaven consisting of an anchored combi-wall of approx. 28 m For more information and inquiries, please refer to the tender and procurement documents in Mercell.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the exact scope of the works at the HES quay?
What is the purpose of the replacement and extension of the quay?
Automatically compiled from the official tender data and documents.