OpenServicesEuropeanRestrictedGreen

Integral design team reconstruction Zone.college location Almelo

Type
Services
71200000 · Architecture and simil
Estimated value
Not published
To deadline
-98d
Mar 10, 2026 · 10:00
Knock-outs
2
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

This tender concerns the selection of an integral design team for the renovation and new construction of the Zone.college location in Almelo. The assignment includes the complete engineering process from concept to execution-ready design for a school building of approximately 10,814 m2.

Services · Restricted · European procedure

Sustainability countsEuropean2 exclusion groundsComplete timeline
Contract type
Services
Restricted
Estimated value
Estimate not published
Submission deadline
March 10, 2026
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Architecture and similar services
Location
Netherlands
CharacteristicsCPV 71ServicesEU tenderGreen / SPParchitectinstallation technical advisorbuilding physics

01What is being requested

Integral design assignment (Total Engineering) for the renovation/new construction of the school location in Almelo with 10,814 m2 GFA. The assignment includes architectural, structural, and installation technical designs, including advice in the fields of building physics, fire safety, and sustainability within a total budgeted amount of approx. € 20 million incl. VAT.

The assignment concerns the integral design assignment (Total Engineering) for the renovation/new construction of the school location in Almelo. The works include the architectural, structural, and installation technical design, including the necessary building physics, fire safety, and sustainability advice and elaborations. The various disciplines participate in the design team.

71200000Services
1Integral design team reconstruction Zone.college location Almelo

02Strategic insight

Strategic insight · AI analysis
<ul Ensure an integral design team where the disciplines (architecture, interior, building physics, fire safety, sustainability, construction, installation, etc.) collaborate seamlessly. Emphasize expertise in the field of educational facilities and experience with (nearly) energy-neutral building. Ensure that the architect can fully fulfill the role of coordinator and contact point for all disciplines to minimize failure costs and lead time.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 6
The assignment is a single lot tender without subdivision.Important
The design team must be able to design (nearly) energy-neutral in accordance with the Program of Requirements Frisse scholen 2021 classification B.Important
The architect acts as the (main) contractor and is responsible for the entire process from concept to execution-ready design.Important
A no temporary housing principle must be taken into account; utilization of existing spaces is leading.Important
The architectural supervision during construction is part of the assignment.Important
All communication must take place via the messaging module in Tenderned; contact with other employees may lead to exclusion.Important

04Can I take part?

Exclusion ground — All grounds for exclusion included in art. 2.86 of the amended Aanbestedingswet apply (Part III, section A and B of the UEA).
Exclusion ground — Optional grounds for exclusion (section C of the UEA): 1. Bankruptcy, insolvency or similar; 2. Distortion of competition; 3. Past performance; 4. False declaration; 5. Unlawful influence.

05Exclusion grounds

Exclusion grounds (2)
  • All grounds for exclusion included in art. 2.86 of the amended Aanbestedingswet apply (Part III, section A and B of the UEA).
  • Optional grounds for exclusion (section C of the UEA): 1. Bankruptcy, insolvency or similar; 2. Distortion of competition; 3. Past performance; 4. False declaration; 5. Unlawful influence.

06Process & timeline

Selection phase: Sending publication text announcement
05-02-2026
Selection phase: Deadline for submitting questions regarding selection guidelines
17-[telefoonnummer verwijderd]u
Selection phase: Sending Note of Clarification selection guidelines
24-02-2026
Selection phase: Closing date for registration (submission of selection data)
1[telefoonnummer verwijderd]u
Selection phase: Opening registrations and sending official report of opening
10-03-2026
Selection phase: Sending results of selection/intention to qualify and rejections
27-03-2026
Tender phase: Sending final tender guidelines
08-04-2026
Tender phase: Information meeting/site visit
15-[telefoonnummer verwijderd]u
Tender phase: Submitting questions regarding tender guidelines
22-[telefoonnummer verwijderd]u
Tender phase: Sending answers to questions in Note of Clarification
07-05-2026
Tender phase: Providing opportunity for clarification questions
12-05-2026
Tender phase: Sending answers to questions in Note of Clarification 2
15-05-2026
Inschrijvingsfase: Indienen inschrijvingen
26-[telefoonnummer verwijderd]u
Inschrijvingsfase: Openen kluis en verzenden proces-verbaal van opening
26-05-2026
Inschrijvingsfase: Presentatie door inschrijvers
23-06-2026
Inschrijvingsfase: Voornemen tot gunning naar beoogde inschrijver en afwijzingen
08-07-2026
Inschrijvingsfase: Definitieve gunning
29-07-2026
Startdatum werkzaamheden
01-09-2026

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

08Likely competitors

#Likely bidderFitWins
1Arcadis Nederland B.V.SME96151×
2Haskoning Nederland B.V.SME96129×
3Sweco Nederland B.V. SME9695×
4Antea Nederland BVSME9677×
5BDG Architecten Ingenieurs Zwolle B.V.SME9115×
6Aveco de Bondt BVSME9019×

09Tender documents

Selectieleidraad Integraal ontwerpteam vernieuwbouw AlmelopdfFeb 6, 2026 · 425 KB
Bijlage 2 Ruimtelijk Functioneel Programma van EisenpdfFeb 6, 2026 · 2356 KB
Bijlage 3 Format ReferentiebeschrijvingdocxFeb 6, 2026 · 24 KB
uea_568363_20260205120404pdfFeb 6, 2026 · 335 KB
Bijlage 5 Planning vernieuwbouw AlmelopdfFeb 6, 2026 · 183 KB
TN568363 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20260205142136pdfFeb 6, 2026 · 142 KB
Bijlage 4 Format SelectievragendocxFeb 6, 2026 · 32 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the scope of the integral design assignment?
The assignment concerns Total Engineering for the renovation/new construction of the school location. This includes the architectural, structural, and installation technical design, including advice and elaborations in the fields of building physics, fire safety, and sustainability.
What experience requirements must the participating disciplines meet?
Bidders must have at least 5 years of experience in comparable educational constructions. A structured team appointment per discipline is required and compliance with European regulations regarding building physics, fire safety, and sustainability.
What supporting documents are required for the suitability of the bidder?
Bidders must submit documents providing evidence of comparable projects (architecture, construction, and installation technology) and reference projects from the 5-year period before or since the composition of the team. Additionally, evidence of CO2 and energy efficiency certifications for sustainability advice is required.
What is the vision regarding the new housing?
The goal is the realization of a 'Green campus' where learning and working come together. The housing must stimulate and facilitate education, whereby the vision on education is leading for the spatial elaboration and the experience of the building.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713