ClosedServicesEuropeanRestrictedGreen

Selection of installation consultants for the Sint-Maartenscollege in Voorburg

Stichting Scholengroep Spinoza · Restricted · 1 lots · 347994
Type
Services
71200000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This project concerns the new construction of the Sint-Maartenscollege in Voorburg for approximately 1,370 students, with a focus on a modern, flexible, and sustainable learning environment.

Services · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Services
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 71ServicesEU tenderGreen / SPP

01What is being requested

The assignment concerns the new construction of the Sint-Maartenscollege in Voorburg, including a school building of approximately 9,311 m2 gross floor area and two gymnasiums of approximately 1,010 m2.

New construction assignment for a secondary school in Voorburg

71200000Services
1Selection of installation consultants for the Sint-Maartenscollege

02Strategic insight

Strategic insight · AI analysis
The designing party must closely translate the educational vision into the spatial layout. Special attention must be paid to the multifunctional usability of the classrooms. Realizing a future-oriented and flexible learning environment is a core requirement.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The design must align with the identity of the school.Important
Account must be taken of a flexible layout of classrooms.Important
The acoustics and indoor climate control are essential for the learning climate.Important
Sustainability is desired via solar panels, heat pumps, and green roofs.Important

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

06Likely competitors

#Likely bidderFitWins
1Arcadis Nederland B.V.SME95151×
2Witteveen+Bos Raadgevende ingenieurs B.V.SME9488×
3BDG Architecten Ingenieurs Zwolle B.V.SME9215×
4abcnova B.V.SME8818×
5HEVO B.V.SME8414×
6Deerns Nederland B.V.SME8320×

07Tender documents

TN484351 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20241002102338pdfOct 2, 2024 · 8 KB
20240924_NvI Installatieadviseur selectie SpinozapdfSep 24, 2024 · 55 KB
Bijlagen NvI Installatieadviseur selectiefasezipSep 24, 2024 · 16585 KB
Bijlage 8_STB-DNR Kruisjeslijst SMC SpinozapdfSep 6, 2024 · 450 KB
Bijlage 1. Schoolplan 2024-2027 Sint-MaartenscollegepdfSep 6, 2024 · 3955 KB
20240906_ Selectieleidraad Installatieadviseur niet-openbare procedure SMCpdfSep 6, 2024 · 759 KB
Bijlage 2. 20230525 Rapportage Massastudie SMC - RothuizenpdfSep 6, 2024 · 13968 KB
Bijlage 6. 20211013 Technisch PvE SMC - HevopdfSep 6, 2024 · 2621 KB
Formulier C. Model referentieprojectdocxSep 6, 2024 · 34 KB
Bijlage 5. 20210923 Ruimtelijk-Functioneel PvE SMC - HevopdfSep 6, 2024 · 2854 KB
Bijlage 7_20240828_Memo aanvullingen PvE SMCpdfSep 6, 2024 · 3254 KB
Bijlage 3. Definitief Ruimtelijk kader Sint Maartenscollege d.d. 30 mei 2023pdfSep 6, 2024 · 1491 KB

08Legal themes that may be relevant here

09Frequently asked questions

What are the specific tasks of the selected installation consultant?
The installation consultant provides the architect with advice and elaborations during the phases of the preliminary design, the Final Design (including required environmental permit based on the Omgevingswet in a construction team), the Technical Design including specifications, and offers guidance during further execution.
What changes have been implemented in the Program of Requirements (PvE) for the new construction?
Mutations have been implemented based on a new lesson schedule, including the merger of drawing and manual skills into the subject 'visual arts', the relocation of mathematics and computer science to the science subjects, and an adjustment to two music classrooms and one drama classroom.
What specific requirements must the classrooms for the 'visual arts' subject meet?
The classrooms must be equipped with student desks with a smooth surface and tables for heavy work such as carpentry and clay. Additionally, there is a need for large storage for all classrooms, suitability for both 2D and 3D work, and access to the machine room and clay oven from all classrooms.
What requirements are set for the layout of the computer science classroom?
The computer science classroom will be housed with the science subjects and must be provided with network connections for fixed computers. There is a specific wish for the layout where students sit at a 90-degree angle to the board, so that no one sits with their back to the board.

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713