PlannedSuppliesMarktconsultatie

Innovation partnership dense phase CO2 pumps

N.V. Nederlandse Gasunie · Marktconsultatie · 1 lots · 408462
Type
Supplies
42120000 · Pumps and compressors
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This market consultation serves as preparation for a European innovation partnership for the development and delivery of CO2 pumps for the Delta Rhine Corridor project. Gasunie is seeking input on technological feasibility, TRL levels, and R&D needs.

Supplies · Marktconsultatie · National procedure

Complete timeline
Contracting authority
Contract type
Supplies
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Pumps and compressors
Location
Netherlands
CharacteristicsCPV 42SuppliesCO2 transportpumpsinnovation partnership

01What is being requested

Development, production, and delivery of dense phase CO2 pumps for the Delta Rhine Corridor project. The assignment includes an innovation partnership for the development and validation of scalable pumps that meet the technical specifications of Gasunie.

Gasunie is currently in the process of preparing a European tender for an innovation partnership concerning the development, manufacturing and delivery of CO2 pumps for the DRC project. As a part of this process Gasunie is conducting this market consultation to gain insight into the extent of possibilities and interest in the market, as well as to determine how a potential tender could best be structured.

42120000Supplies
1Innovation partnership dense phase CO2 pumps

02Strategic insight

Strategic insight · AI analysis
During the market consultation, focus on sharing technological possibilities and the current TRL levels of your concepts. Provide detailed input regarding the required R&D activities and the integration into the pump station environment. Be prepared for close collaboration with Gasunie and Sweco throughout the entire process.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The technical specifications are currently indicative.Important
The exact fluid composition will only be determined during the R&D phase.Important
The required Technology Readiness Level must be established via an independent assessment.Important
The start-up procedure without recycling is currently not applicable.Important
The design temperature may be refined during the R&D phase based on assessments.Important

04Process & timeline

Publication of market consultation
<strong>15 januari 2026</strong>
Deadline for submitting questions
<strong>2 februari 2026</strong>
Publication of memorandum of information
<strong>5 februari 2026</strong>
Deadline for submitting responses
<strong>16 februari 2026</strong>
Clarification meetings (optional)
<strong>3/4 maart 2026</strong>
Expected publication of tender
<strong>maart/april 2026</strong>
Planned delivery of pumps
<strong>2029</strong>

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

06Likely competitors

#Likely bidderFitWins
1Sweco Nederland B.V. SME9770×
2Sulzer Pumps Wastewater Netherlands B.V.SME9562×
3Movares Nederland B.V.SME9148×
4WSP Nederland B.V.SME8115×
5Xylem Water Solutions Nederland B.V.SME78
6Distrimex Pompen & Service B.V.SME75

07Tender documents

Notice of Information - market consultation innovationpar (1)pdfFeb 5, 2026 · 143 KB
Annex A - Response formdocxJan 15, 2026 · 65 KB
TN566615 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20260115161550pdfJan 15, 2026 · 136 KB
Market consultation document innovation partnership CO2 pumpspdfJan 15, 2026 · 1088 KB
Annex B - Template for submitting questions (1)xlsJan 15, 2026 · 47 KB

08Legal themes that may be relevant here

09Frequently asked questions

How is the Technology Readiness Level (TRL) established?
API RP 17Q is used as a reference framework for the Technology Readiness Levels (TRL). This is intended to provide a clear and verifiable scale, independent of the subsea application.
What is the expected composition of the fluid to be pumped?
The composition is currently indicatively set at CO₂ ≥ 95 mol%. The exact composition and its effects on material requirements will be determined during the R&D phase of the innovation partnership.
What is the purpose of this phase?
The purpose is to gain insight into the possibilities and interest in the market, in order to determine the optimal structure for a future tender.
What is the core of the assignment within the innovation partnership?
The partnership focuses on the development, production, and delivery of CO2 pumps for the DRC project.

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 300K
median
€ 800K
p75
€ 4,0 mln
deze opdracht

Gegunde waarden in CPV 42 · leveringen n=273