Procurement Traction Cable project TEV2024
GVB Holding N.V. has launched an open tender for the supply of a robust traction cable for the metro project TEV2024. Due to the influx of new metro rolling stock (M5) and growing passenger numbers, an enhanced power supply is necessary. The 'metro traction reinforcement' project aims to realize a reliable and scaled-up power supply, in which the traction installation of the NZ line is integrated into the existing traction energy system. The cable must be produced and ready for call-off before mid-August 2023, and will be transferred as a direct delivery to the contractor for the construction and installation of the traction energy supply. The tender concerns a supply contract; the cable will be purchased separately prior to the award for the construction and installation of the traction energy supply.
Supplies · Open · European procedure
01What is being requested
GVB Holding N.V. has launched an open tender for the supply of a robust traction cable for the metro project TEV2024. Due to the influx of new metro rolling stock (M5) and growing passenger numbers, an enhanced power supply is necessary. The 'metro traction reinforcement' project aims to realize a reliable and scaled-up power supply, in which the traction installation of the NZ line is integrated into the existing traction energy system. The cable must be produced and ready for call-off before mid-August 2023, and will be transferred as a direct delivery to the contractor for the construction and installation of the traction energy supply. The tender concerns a supply contract; the cable will be purchased separately prior to the award for the construction and installation of the traction energy supply.
Due to the influx of new metro rolling stock (M5) and the growth in passenger numbers, there is a need for a more robust power supply for the metro. To this end, the metro traction reinforcement project has been launched, which aims to realize a more reliable and scaled-up power supply in which, additionally, the traction installation of the NZ line is integrated into the existing traction energy system of the metro. With the realization of this project, these cables will be replaced where necessary. The cable will be separately tendered and commissioned in advance of the award for the tender
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
04Bidders in this segment
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the purpose of the procurement of the traction cable?
What is the intended delivery date of the traction cable?
How will the purchased cable be delivered?
What is the relationship between this supply and the construction of the power supply?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 260K
€ 526K
€ 1,4 mln
Gegunde waarden in CPV 31 · leveringen n=168