ClosedWorksEuropeanRestrictedGreen

The design, implementation, and operational handover of the distribution stations for the Masterplan Power Grid at Schiphol

Schiphol Nederland BV · Restricted · 1 lots · 358087
Type
Works
45200000
Estimated value
€ 56M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Schiphol Nederland BV has a tender for the design, implementation, and operational handover of distribution stations within the framework of the Masterplan Power Grid 2060. The assignment is aimed at increasing the electricity capacity of the airport to support the transition to electric transport and the reduction of fossil fuels. The new distribution stations must meet current and future requirements for safety, reliability, and scalability, and must be integrated with the existing grid and planned expansions. The procurement follows a non-public procedure, meaning only selected suppliers are invited to submit a proposal. The contracting authority expects a complete project plan, including design, construction, testing, delivery, and aftercare, with a focus on minimizing operational disruptions and ensuring the continuity of airport activities.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
€56,000,000
estimated value
Submission deadline
Ongoing
17:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPdistribution stationsMasterplan Power GridSchiphol

01What is being requested

Schiphol Nederland BV has a tender for the design, implementation, and operational handover of distribution stations within the framework of the Masterplan Power Grid 2060. The assignment is aimed at increasing the electricity capacity of the airport to support the transition to electric transport and the reduction of fossil fuels. The new distribution stations must meet current and future requirements for safety, reliability, and scalability, and must be integrated with the existing grid and planned expansions. The procurement follows a non-public procedure, meaning only selected suppliers are invited to submit a proposal. The contracting authority expects a complete project plan, including design, construction, testing, delivery, and aftercare, with a focus on minimizing operational disruptions and ensuring the continuity of airport activities.

Following the Paris Agreement, SNBV has developed a vision to be emission-free with its own airport activities by 2030. To realize these ambitions, the use of natural gas and fossil fuels will be phased out, and as much as possible, a transition to electrically powered transport and equipment will be made. Consequently, the demand for electricity at Schiphol will increase. To ensure that the electricity network is future-proof and can meet the demand of all connected parties, Schiphol has drafted the Masterplan Power Grid (MPG) 2060.

45200000€ 56MWorks
1The design, implementation, and operational handover of the distribution stations for the Masterplan Power Grid at Schiphol€56,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€56,000,000

04Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9473×
2BAM Infra B.V.SME9277×
3KWS Infra B.V.SME9192×
4Heijmans Infra B.V.SME8965×
5Anton Rail & Infra B.V.SME8821×
6SPIE Nederland B.V.SME8723×

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of the assignment regarding the Masterplan Power Grid?
The assignment is aimed at the design, implementation, and operational handover of distribution stations to increase the electricity capacity at Schiphol. This supports the transition to electric transport and the reduction of fossil fuels within the Masterplan Power Grid 2060.
Why is the implementation of these distribution stations necessary for Schiphol Nederland BV?
To realize the vision that its own airport activities are emission-free by 2030, the use of natural gas and fossil fuels is being phased out. The increasing demand for electricity requires a future-proof electricity network that can meet the demand of all connected parties.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 56 mln

Gegunde waarden in CPV 45 · werken n=3159