The supply of gas-fired hot water boilers for various projects
The tender by N.V. HVC concerns the supply of gas-fired hot water boilers for multiple projects, including Zuidwijk, Assendelft, and TEA Gorinchem. It concerns a competitive procedure with negotiation, in which the contracting authority has established full specifications and legal conditions in the Request Specification. Suppliers must meet technical requirements, safety standards, and delivery conditions, and must be able to deliver within the specified timeframes. The procedure requires a detailed bid, including price structure, quality guarantees, and service conditions. The contracting authority expects a reliable partner with experience in similar installations that can meet the requirements for energy efficiency and environmental friendliness.
Works · Competitive procedure with negotiation · European procedure
01What is being requested
The tender by N.V. HVC concerns the supply of gas-fired hot water boilers for multiple projects, including Zuidwijk, Assendelft, and TEA Gorinchem. It concerns a competitive procedure with negotiation, in which the contracting authority has established full specifications and legal conditions in the Request Specification. Suppliers must meet technical requirements, safety standards, and delivery conditions, and must be able to deliver within the specified timeframes. The procedure requires a detailed bid, including price structure, quality guarantees, and service conditions. The contracting authority expects a reliable partner with experience in similar installations that can meet the requirements for energy efficiency and environmental friendliness.
The Contract tendered through this Procurement Procedure concerns the supply of gas-fired hot water boilers for various projects. In the “Request Specification”, the Contract, including the applicable legal conditions, is fully described for the various projects Zuidwijk, Assendelft, and TEA Gorinchem.
02Breakdown by lot
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
05Likely competitors
06Legal themes that may be relevant here
07Frequently asked questions
What is the specific content of the assignment?
For which specific projects are the boilers being supplied?
What is the function of the boilers in the TEA Gorinchem project?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159