ClosedWorksOpen

REDESIGN OF PUBLIC SPACE LOPPERSUM-NOORD

Gemeente Loppersum · Open · 1 lots · 192251
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Loppersum is using an open procedure for the redesign of the public space in Loppersum Noord. The project is being executed via a construction team contract, through which the architect, contractor, and contracting authority jointly coordinate the design and execution. This model was chosen because the full scope has not yet been established and there is a strong interest in a plan supported by the community, from concept to realization. The focus is on creating an attractive, safe, and functional public space, with attention to mobility, greenery, and social interaction. The construction team structure promotes transparency, collaboration, and timely decision-making, while the open procedure invites a wide range of bidders.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
LOPPERSUM
CharacteristicsCPV 45Worksredesignpublic spaceconstruction team contract

01What is being requested

The Municipality of Loppersum is using an open procedure for the redesign of the public space in Loppersum Noord. The project is being executed via a construction team contract, through which the architect, contractor, and contracting authority jointly coordinate the design and execution. This model was chosen because the full scope has not yet been established and there is a strong interest in a plan supported by the community, from concept to realization. The focus is on creating an attractive, safe, and functional public space, with attention to mobility, greenery, and social interaction. The construction team structure promotes transparency, collaboration, and timely decision-making, while the open procedure invites a wide range of bidders.

The project is located in the village of Loppersum (see map). The current public space has been earmarked for a redesign for several years. As a municipality, we have made the choice to realize the redesign of Loppersum Noord by means of a construction team contract. The reason for this is that not everything has been finalized yet. Furthermore, it is very important that a plan is developed that, from the preliminary design to the realization, is supported by the community.

45000000Works
1Lot 1

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9769×
2KWS Infra B.V.SME9692×
3Heijmans Infra B.V.SME9665×
4Combinatie Heijmans - SWARCOUnknown9573×
5Dura Vermeer Infra Regionale Projecten BVSME9558×
6Heijmans Utiliteit B.V.SME9527×

04Tender documents

Nota van Inlichtingen 2020-05-18-1pdfMay 18, 2020 · 48 KB
Nota van Inlichtingen 2020-04-23-1pdfApr 23, 2020 · 67 KB
TN257621 - SF02 Aankondiging van een opdracht 20200409132453pdfApr 9, 2020 · 30 KB
REFERENTIE PROJECT 2.5-BdocxApr 9, 2020 · 19 KB
20180711_1739_LOPOL_A0_Loppersum_NoordpdfApr 9, 2020 · 2136 KB
uea_257621_20200402142415xmlApr 9, 2020 · 65 KB
uea_257621_20200402142415pdfApr 9, 2020 · 21 KB
2019_ 44_D Notitie afkoppelplan Loppersum NoordpdfApr 9, 2020 · 1386 KB
2020-4-9 INSCHRIJVINGSLEIDRAAD vers 01pdfApr 9, 2020 · 710 KB
REFERENTIE PROJECT 2.5-AdocxApr 9, 2020 · 19 KB

05Legal themes that may be relevant here

06Frequently asked questions

In what manner will the redesign of Loppersum-Noord be carried out?
The redesign will be realized by means of a construction team contract. In this process, the architect, the contractor, and the contracting authority work together to coordinate the design and execution.
Why was a construction team contract chosen for this project?
A construction team contract was chosen because the full scope of the redesign has not yet been fully finalized. Additionally, it is essential that the plan, from the preliminary design to the realization, is supported by the community.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159