Redesign of Lage Raam and Hooge Raam / Halsche Beek
The assignment ‘Redesign of Lage Raam and Hooge Raam/Halsche Beek’ is a UAV-gc contract from Waterschap Aa en Maas. The objective is to realize a climate-resilient, ecologically functional, and livable stream valley. The works include 18 km of stream redesign, 1.75 km of nature-friendly riverbank, the construction of a fauna passage and amphibian ponds, the removal of 16 fish migration bottlenecks, 146 ha of regional water storage to protect Grave, optimization of stream profiles and weirs according to NBW standards, and hydrological design for nature development within the Natuurnetwerk Brabant and the Natte Natuurparel. Additionally, the cultural-historical and landscape values must be preserved and recreational routes strengthened. The assignment is focused on sustainable water and nature management solutions in an urban and natural landscape.
Works · Restricted · European procedure
01What is being requested
The assignment ‘Redesign of Lage Raam and Hooge Raam/Halsche Beek’ is a UAV-gc contract from Waterschap Aa en Maas. The objective is to realize a climate-resilient, ecologically functional, and livable stream valley. The works include 18 km of stream redesign, 1.75 km of nature-friendly riverbank, the construction of a fauna passage and amphibian ponds, the removal of 16 fish migration bottlenecks, 146 ha of regional water storage to protect Grave, optimization of stream profiles and weirs according to NBW standards, and hydrological design for nature development within the Natuurnetwerk Brabant and the Natte Natuurparel. Additionally, the cultural-historical and landscape values must be preserved and recreational routes strengthened. The assignment is focused on sustainable water and nature management solutions in an urban and natural landscape.
The assignment for the redesign of the sub-areas Lage Raam and Hooge Raam/Halsche Beek aims to develop a robust, climate-resilient, ecologically well-functioning and livable stream valley, where living, working, and staying is good both now and in the future. Can be achieved by realizing this assignment, the water board gives shape to the various tasks from the Waterbeheerplan 2022-2027 (WBP/Water Management Plan 2022-2027): - Realization of 18 km of stream redesign and 1.75 km of nature-friendly riverbank (NVO) and construction of a fauna passage and amphibian ponds for a more natural strea
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
Which specific works are carried out within the stream redesign?
How is the city of Grave protected against flooding through this assignment?
What role does the assignment play in nature development in the area?
Which contract form is used for this assignment?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159