Interior construction redesign Oss town hall
This project involves the design, supply, and installation of interior construction for the Oss town hall. Modifications will be made on all floors, taking into account building, electrical, audiovisual, upholstery, planting, signage, and visual applications. The office floors must be delivered in 2024, the ground floor in early 2025, with completion around March 2025.
Supplies · Open · European procedure
01What is being requested
This project involves the design, supply, and installation of interior construction for the Oss town hall. Modifications will be made on all floors, taking into account building, electrical, audiovisual, upholstery, planting, signage, and visual applications. The office floors must be delivered in 2024, the ground floor in early 2025, with completion around March 2025.
This tender relates to the manufacture, supply, and installation of interior construction. The building consists of 5 floors. Various sections of interior construction will be installed/modified on all floors. The objective is to deliver the office floors in 2024. The ground floor will be modified in early 2025 and delivered around March 2025. During execution, several modifications or additions will be made, such as building, electrical, interior construction, audiovisual equipment, upholstery, planting, signage, and visuals. Coordination will be carried out within a construction team and m
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
04Bidders in this segment
05Legal themes that may be relevant here
06Frequently asked questions
What is the scope of the town hall redesign?
What is the intended completion date of the works?
How is the execution of the assignment coordinated?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 196K
€ 480K
€ 1,5 mln
Gegunde waarden in CPV 39 · leveringen n=792