Redesign of Erasmusweg and Van Goghstraat

Gemeente Bodegraven - Reeuwijk · Open · 1 lots · 346439
Type
Works
45233222
Estimated value
€ 1,59M
awarded
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

The Municipality of Bodegraven - Reeuwijk is tendering the reconstruction of the Erasmusweg and Van Goghstraat, where the award will be based on the lowest price.

Works · Open · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Open
Estimated value
€1,594,000
awarded value
Submission deadline
Ongoing
11:59
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPP

01What is being requested

The assignment concerns the reconstruction of the Van Goghstraat and the Erasmusweg. The work includes various activities such as the removal of slag foundations and the installation of sewerage and street works.

The municipality aims to renew the public layout in the project area.Settlement has occurred in the project area approximately 30 years after construction.Both the paving and the greenery are due for replacement.A new HWA sewerage system must also be installed and a small section of DWA must be replaced.The project area will be redesigned.The work mainly consists of:a. the removal of element paving;b. the partial removal of hydraulically bound foundation layers;c. performing earthworks;d. applying dewatering;e. cleaning and inspecting existing combined sewerage;f. the removal and installation

45233222Works
1Reconstruction Van Goghstraat & Erasmusweg

02Outcome

Awarded

G.W.W. Werken Scherrenberg B.V.

Award value
€1,594,000
Bidders
4

03Strategic insight

Strategic insight · AI analysis
Take into account the no provisional sum rule for damage to cables and pipelines. Ensure that the BRL9334 certification is in order for the street works. Calculate the transport costs based on a maximum distance of 15km.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 6
Work shall be carried out in accordance with the CROW-500 guideline.Important
Damage to cables and pipelines must be covered by the bidder; no provisional sum is possible.Important
The maximum transport distance for disposal is set at 15km.Important
Work must be carried out with as little vibration as possible.Important
The bidder has a duty of coordination regarding utility companies.Important
For vibration measurements, 3 vibration meters per side per 100m road length is sufficient.Important

05Can I take part?

Technical — The bidder must possess at least BRL9334 for the street works.

06Award criteria

lowest priceweight n/a

The contracting authority assumes award based on the lowest price.

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2BAM Infra B.V.SME10077×
3Combinatie Heijmans - SWARCOUnknown10073×
4Van Gelder BVSME10053×
5Boskalis Nederland B.V.SME10070×
6Heijmans Infra B.V.SME10065×

09Tender documents

TN480394 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250715140005pdfJul 15, 2025 · 9 KB
3e_Nota_Def_20240916zipSep 16, 2024 · 1151 KB
2e_Nota_Def_20240212zipSep 12, 2024 · 1344 KB
Nota_Def_20240910zipSep 10, 2024 · 7088 KB
Nota van inlichtingen 2024-09-10-2pdfSep 10, 2024 · 21 KB
TN480394 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240821111923pdfAug 21, 2024 · 9 KB
Publicatie_TenderNetzipAug 21, 2024 · 458876 KB

10Legal themes that may be relevant here

11Frequently asked questions

Must the tiles for the redesign be supplied by the contractor?
Yes, for item 441020 it has been determined that the tiles must be supplied; this specification item has been changed.
Is there a provisional sum available for repairing damage to cables and pipelines during the removal of the slag foundation?
No, no provisional sum is included. Bidders must assume that the relevant cables and pipelines are located in ducting and must work in accordance with the CROW-500 guideline.
How should the requirement for low-vibration work be handled in the BLVC plan?
Bidders must aim for as little vibration as possible. The BLVC plan has been changed following this question.
What is the composition of the quantity of slag for the disposal and acceptance costs?
The stated quantity includes the blast furnace slag that must be broken up for house/gully connections, inlets, gullies, and manholes. Specification item 165310 has been adjusted accordingly.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 1,6 mln

Gegunde waarden in CPV 45 · werken n=3159