Large-scale replacement of rectifier stations for metro and tram GVB (Amsterdam)

GVB Infra B.V. · Restricted · 2 lots · 328707
Type
Works
45234120
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

GVB Infra B.V. is looking for an engineering firm and contractor for the large-scale replacement of 44 rectifier stations (28 tram, 16 metro) and the replacement of approximately 33 km of traction cable for the tram in Amsterdam. The works must be carried out within the period up to and including 2034. The market consultation is intended to involve the market in thinking along regarding the selection of the right partners. The assignment requires extensive experience in the design, supply, and installation of high-voltage and low-voltage systems for public transport, knowledge of Dutch regulations, and the ability to operate within tight schedules and safety standards.

Works · Restricted · European procedure · SME-friendly

SME-friendlyEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
2
2 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksSME-friendlyEU tenderrectifier stationstrammetro

01What is being requested

GVB Infra B.V. is looking for an engineering firm and contractor for the large-scale replacement of 44 rectifier stations (28 tram, 16 metro) and the replacement of approximately 33 km of traction cable for the tram in Amsterdam. The works must be carried out within the period up to and including 2034. The market consultation is intended to involve the market in thinking along regarding the selection of the right partners. The assignment requires extensive experience in the design, supply, and installation of high-voltage and low-voltage systems for public transport, knowledge of Dutch regulations, and the ability to operate within tight schedules and safety standards.

A large part of the rectifier stations of the Amsterdam tram and metro is outdated and must be renewed. In the period up to and including 2034, it is foreseen that the installations of a total of 44 rectifier stations will be completely replaced, 28 units for tram and 16 units for metro. Additionally, approximately 33 km of traction cable must be replaced for the tram. It is not yet necessary to contract the engineering firm and the contractor. Through this market consultation, the market is asked to provide input and think along regarding this.

45234120Works
1Metro
2Tram

02Breakdown by lot

Metron/a
Tramn/a

Per-lot values not published — bars show only the lot breakdown.

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Likely competitors

#Likely bidderFitWins
1Strukton Rail Nederland bvSME10033×
2VolkerRail Nederland B.V.SME10031×
3KWS Infra B.V.SME9892×
4Arcadis Nederland B.V.SME96116×
5Sweco Nederland B.V. SME9671×
6Movares Nederland B.V.SME9649×

06Tender documents

TN456174 - EF05 Periodieke indicatieve aankondiging die alleen ter informatie wordt gebruikt - sectorale richtlijn 20240308175918pdfMar 10, 2024 · 7 KB
Bijlage 1 Vragen Marktconsultatie d.d. 8-3-2024xlsxMar 10, 2024 · 88 KB
Uitnodiging marktconsultatie gelijkrichterstations d.d. 8-3-2024pdfMar 10, 2024 · 307 KB
Bijlage 2 SpelregelspdfMar 10, 2024 · 20 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the scope of the replacement of the rectifier stations?
In the period up to and including 2034, a total of 44 rectifier stations will be completely replaced. This concerns 28 stations for the tram and 16 stations for the metro.
What works are involved in addition to the rectifier stations?
In addition to the replacement of the rectifier stations, approximately 33 km of traction cable must be replaced for the tram.
What is the purpose of this market consultation?
Through this market consultation, the market is asked to provide input and think along regarding the selection of the right engineering firm and the contractor for the large-scale replacement of the installations.
Until when does the planned period for the works run?
The replacement of the installations and the associated works is foreseen to be carried out in the period up to and including 2034.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159