AwardedWorksEuropeanOpen

Major maintenance of primary sedimentation tanks (VBT's) RWZI Eindhoven

Waterschap De Dommel · Open · 1 lots · 334463
Type
Works
45252000
Estimated value
€ 8,90M
awarded
To deadline
Ongoing
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
3 criteria
Assess manuallyconfidence high

This project concerns the major maintenance of three primary sedimentation tanks at the RWZI Eindhoven, where the focus lies on civil engineering structures and necessary dewatering.

Works · Open · European procedure

European1 exclusion groundsComplete timeline
Contracting authority
Contract type
Works
Open
Estimated value
€8,895,247
awarded value
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderprimary sedimentation tanksRWZI Eindhovenmajor maintenance

01What is being requested

Execution of major maintenance on three primary sedimentation tanks at the RWZI Eindhoven, focused on the civil engineering components such as the concrete structure, cover, and steel overflow channels during a term of 36 months.

Waterschap De Dommel manages three primary sedimentation tanks at the RWZI Eindhoven. These date from the 1960s/early 1970s and are in moderate condition. In connection with future-proofing, major maintenance must be carried out on these primary sedimentation tanks, primarily concerning the civil engineering components (concrete structure, cover, and steel overflow channels).

45252000Works
1Major maintenance of primary sedimentation tanks (VBT's) RWZI Eindhoven

02Outcome

Awarded

GMB Civiel B.V.

Award value
€8,895,247
Bidders
2

03Strategic insight

Strategic insight · AI analysis
Ensure a very detailed plan of approach that complies with the strict page and font requirements. Verify whether all technical certificates such as BRL3201 and the Co2 ladder are up to date. Take into account the dewatering duration and the necessary permit procedure for groundwater extraction.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 5
Use the new working tender form to prevent formula errors.Important
When determining the price, assume the absence of chromium 6.Important
Dewatering is subject to a permit from Waterschap De Dommel due to the expected duration and quantity.Important
A dewatering plan must be drawn up, including discharge and monitoring measures.Important
Discharge of the dewatering water is expected to take place at the RWZI due to soil contamination.Important

05Can I take part?

Exclusion ground · 1
E1 No criminal record: the bidder or candidate has not been convicted of participation in a criminal organization, bribery, fraud, or money laundering.Exclusion ground
Technical · 4
E2 Core competency 1: Realization: demonstrable experience as a main contractor for a project of at least € 4,000,000.00 excl. VAT (new construction, renovation, or expansion of an RWZI) completed within the last 5 years.Technical
E3 Core competency 2: substantive / technical (new construction): demonstrable experience with the realization of a primary sedimentation tank or secondary sedimentation tank with a diameter of at least 40 m, completed within the last 5 years.Technical
E4 Core competency 3: Substantive / technical (renovation): demonstrable experience with concrete renovation for at least € 500,000.00 excl. VAT, completed within the last 5 years.Technical
E5 Skill requirements: valid VCA** certificate, valid ISO9001 quality system certificate, valid concrete repair certificate (BRL3201-01 and BRL3201-02) and Co2 ladder level 5 certification.Technical

06Exclusion grounds

Exclusion grounds (1)
  • E1 No criminal record: the bidder or candidate has not been convicted of participation in a criminal organization, bribery, fraud, or money laundering.

07Award criteria

Plan of approach1 288 000

Submission of a plan of approach of maximum 3 A4 single-sided pages (Arial 10 point) with sub-award criteria and a schedule of maximum 1 A3.

Safety culture ladder112 000

Submission of the Safety culture ladder certificate; the achieved level provides a fictitious discount.

Priceweight n/a

The price of the bid.

08Process & timeline

Requests for additional information
23/05/2024 10:00 +02:00
Tender deadline
10/06/2024 10:00 +02:00
Opening
10/06/2024 10:30 +02:00
Intended start dewatering VBT 3
01/09/2024
Intended start dewatering VBT 2
01/09/2025
Intended start dewatering VBT 3 (second phase)
01/09/2026

09Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

10Bidders in this segment

#Likely bidderFitWins
1Heijmans Infra B.V.SME9865×
2ENGIE Infra & Mobility B.V.SME9769×
3KWS Infra B.V.SME9692×
4BAM Infra B.V.SME9677×
5Boskalis Nederland B.V.SME9669×
6Dura Vermeer Infra Regionale Projecten BVSME9658×

11Tender documents

TN463930 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20240719112810pdfJul 21, 2024 · 9 KB
Bijlage 220200-06002-2 Inschrijvingsstaat bestek ondhoud VBT's RWZI Eindhoven NvI 6-6-2024xlsxJun 6, 2024 · 28 KB
Nota van inlichtingen 2024-06-06-2pdfJun 6, 2024 · 2 KB
Vraag 15 13-6600-1-0001_6600-1 Luchtbehandeling voorbezinktanks en zandvangerspdfMay 29, 2024 · 468 KB
220200-02602-1 Tijdschema groot onderhoud VBT's RWZI EindhovenpdfMay 29, 2024 · 636 KB
Nota van inlichtingen 2024-05-29-7pdfMay 29, 2024 · 32 KB
Proces verbaal van aanwijzing Groot onderhoud voorbezinktanks (VBT's) RWZI EindhovenpdfMay 29, 2024 · 39 KB
Vraag 15 1400-2 P&ID VBTen RBT_ ontvangput en tussengemaalpdfMay 29, 2024 · 280 KB
Vraag 15 13-6600-2-0001_6600-2 Luchtbehandeling voorbezinktanks en zandvangerspdfMay 29, 2024 · 338 KB
Bijlage 220200-06002-2 Inschrijvingsstaat bestek ondhoud VBT's RWZI Eindhoven NvIxlsxMay 29, 2024 · 28 KB
230041 Eindhoven bemalingsadvies groot onderhoud RWZI v3 (12-4-2024)pdfMay 29, 2024 · 4088 KB
TN463930 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240425191856pdfApr 27, 2024 · 11 KB

12Legal themes that may be relevant here

13Frequently asked questions

What is the specific scope of the maintenance to the primary sedimentation tanks?
The major maintenance concerns three primary sedimentation tanks at the RWZI Eindhoven dating from the 1960s and early 1970s. The works focus on the civil engineering components, specifically the concrete structure, the cover, and the steel overflow channels.
What is the purpose of the works on the primary sedimentation tanks?
The works are necessary to ensure the future-proofing of the three primary sedimentation tanks at the RWZI Eindhoven, as the structures are currently in moderate condition.
Which civil engineering elements are addressed during the renovation?
The focus of the maintenance lies on the concrete structure, the repairing or replacing of damaged concrete blocks, the cover, and the steel overflow channels.

Automatically compiled from the official tender data and documents.

14Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159