ClosedWorksEuropeanRestrictedGreen

Land Issuance Kanaalknoop Zuid phase 1

gemeente Nijmegen · Restricted · 1 lots · 324844
Type
Works
45211300
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Nijmegen intends to realize the development location ‘Kanaalknoop Zuid Fase 1’ in Winkelsteeg via a non-public procedure. The project focuses on an urban residential and non-residential program around the bridge of the Nieuwe Dukenburgseweg, including light industry, catering, and consumer-oriented services. The buildings must embrace the bridge, create a high-rise accent, and establish a connection with the low-lying public space of the canal bank. The objectives are a diverse live-work environment, a lively waterfront, a pleasant residential area near the Winkelsteeg park, and an urban living and working environment with attention to energy, climate adaptation, water management, and a low-traffic neighborhood.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPkanaalknoopWinkelsteegMaas-Waalkanaal

01What is being requested

The Municipality of Nijmegen intends to realize the development location ‘Kanaalknoop Zuid Fase 1’ in Winkelsteeg via a non-public procedure. The project focuses on an urban residential and non-residential program around the bridge of the Nieuwe Dukenburgseweg, including light industry, catering, and consumer-oriented services. The buildings must embrace the bridge, create a high-rise accent, and establish a connection with the low-lying public space of the canal bank. The objectives are a diverse live-work environment, a lively waterfront, a pleasant residential area near the Winkelsteeg park, and an urban living and working environment with attention to energy, climate adaptation, water management, and a low-traffic neighborhood.

One of the first sub-areas in Winkelsteeg that the Municipality of Nijmegen intends to develop is the development location “Kanaalknoop Zuid Fase 1”. Regularly, at the western side of Winkelsteeg, around the bridge of the Nieuwe Dukenburgseweg, the Municipality of Nijmegen, in collaboration with market parties, intends to develop an area that will give Winkelsteeg a face at the Maas-Waalkanaal: the Kanaalknoop. Within the Kanaalknoop, a residential program is largely envisioned, combined with a non-residential program consisting of light industry, consumer-oriented services, and catering. Th

45211300Works
1Land Issuance Kanaalknoop Zuid phase 1€1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9258×
2Van Gelder BVSME9253×
3KWS Infra B.V.SME9192×
4BAM Infra B.V.SME9177×
5Boskalis Nederland B.V.SME9169×
6Heijmans Infra B.V.SME9165×

05Legal themes that may be relevant here

06Frequently asked questions

What is the intended program for the Kanaalknoop Zuid Fase 1 location?
The development comprises a largely residential program combined with a non-residential program consisting of light industry, consumer-oriented services, and catering.
What spatial objectives does the Municipality of Nijmegen set for this area?
The Municipality aims for an urban residential environment with high-rise accents around the bridge of the Nieuwe Dukenburgseweg, a lively waterfront with urban density, and a connection to the public space of the canal bank.
Which themes are the focus during the realization of the urban living and working environment?
During the development of the living and working environment, specific attention is paid to energy, climate adaptation, water management, and the realization of a low-traffic neighborhood.
What is the vision regarding the connection between the buildings and the surroundings?
The buildings must embrace the bridge of the Nieuwe Dukenburgseweg and establish a connection—both spatially and programmatically—with the lower-lying public space of the canal bank to activate the route along and across the canal.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159