ClosedWorksEuropeanCompetitive dialogueGreen

Greenest and most sustainable parking garage in the Netherlands

Gemeente Nieuwegein · Competitive dialogue · 1 lots · 272823
Type
Works
45213312
Estimated value
€ 15M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Nieuwegein intends to contract one contractor for the construction of the greenest and most sustainable parking garage in the Netherlands. The contract consists of the design and realization of the Zuid parking garage and requires a total solution in which sustainability, circularity, energy efficiency, and innovative construction techniques are central. The contractor must provide an integrated approach that seamlessly connects building, installation, structural, and safety aspects. The procedure is a competitive dialogue, allowing the municipality to develop an optimal, sustainable solution together with selected candidates. The tender focuses on a high-quality, future-proof parking system with possibilities for renewable energy, circular materials, water management, and smart infrastructure. The contractor must demonstrate experience with similar projects, a strong focus on circularity, and a robust project management plan.

Works · Competitive dialogue · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Competitive dialogue
Estimated value
€14,999,999
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Nieuwegein
CharacteristicsCPV 45WorksEU tenderGreen / SPPsustainabilitycircularparking garage

01What is being requested

The Municipality of Nieuwegein intends to contract one contractor for the construction of the greenest and most sustainable parking garage in the Netherlands. The contract consists of the design and realization of the Zuid parking garage and requires a total solution in which sustainability, circularity, energy efficiency, and innovative construction techniques are central. The contractor must provide an integrated approach that seamlessly connects building, installation, structural, and safety aspects. The procedure is a competitive dialogue, allowing the municipality to develop an optimal, sustainable solution together with selected candidates. The tender focuses on a high-quality, future-proof parking system with possibilities for renewable energy, circular materials, water management, and smart infrastructure. The contractor must demonstrate experience with similar projects, a strong focus on circularity, and a robust project management plan.

The municipality intends to contract one contractor for the construction of the greenest and most sustainable parking garage in the Netherlands. The contract contains two main parts: on the one hand the design and on the other hand the realization of the Zuid parking garage. The municipality wishes to contract a total solution where sustainability and circularity are highly valued. The design, building, installation, structural, and safety components must be strongly integrated with one another.

45213312€ 15MWorks
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€14,999,999

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9165×
2BAM Bouw en Techniek bvSME9134×
3Boskalis Nederland B.V.SME9069×
4Van Gelder BVSME9053×
5Hegeman Bouw & Infra B.V.SME8831×
6Den Ouden Aannemingsbedrijf B.V.SME8823×

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific assignment of this tender?
The assignment includes the design and realization of the Zuid parking garage, whereby the municipality aims for the greenest and most sustainable parking garage in the Netherlands.
Which core aspects are central to the requested total solution?
The assignment requires an integrated approach in which sustainability, circularity, energy efficiency, innovative construction techniques, building, installation, structural, and safety aspects are closely interconnected.
Which themes does the parking garage focus on regarding infrastructure?
The assignment focuses on a future-proof parking system with possibilities for renewable energy, circular materials, water management, and smart infrastructure.
What expertise requirements must the contractor meet?
The contractor must be able to demonstrate experience with similar projects, have a strong focus on circularity, and be able to submit a robust project management plan.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 15 mln