Greenspace and tree renovations Municipality of Barendrecht

Type
Services
77310000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

Framework agreement for various greenspace and tree renovation works in the public space of the Municipality of Barendrecht with a maximum duration of over four years.

Services · Open · European procedure

Sustainability countsEuropean
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 77ServicesEU tenderGreen / SPP

01What is being requested

The assignment concerns a framework agreement for greenspace and tree renovations within the Municipality of Barendrecht. The works include, among other things, the removal and planting of vegetation and trees, earthworks, installation of grass and flower vegetation, and watering vegetation during an initial term of 16 months.

The assignment includes the renovation of greenspace areas and the removal of trees located within the municipal boundaries of the Municipality of Barendrecht.

77310000Services
1Greenspace and tree renovations Municipality of Barendrecht

02Outcome

Awarded

J. van Huizen Groenvoorzieningen B.V.

Bidders
2

03Strategic insight

Strategic insight · AI analysis
Ensure sufficient operational capacity to work on various sub-assignments simultaneously. Take the seasonal nature of the works into account when planning personnel. Verify the required APV exemptions in a timely manner for works outside of standard hours.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 6
The contractor must, if necessary, be able to work on multiple sub-assignments simultaneously.Important
For sub-assignments, the available space for storage of materials may be limited or non-existent.Important
An APV exemption is required for working on Saturdays.Important
Work may not be performed on Sundays.Important
The contractor is the owner of certain released materials such as trunk wood and branch wood.Important
The contractor must draw up a quality plan in accordance with the Standard 2020.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

07Bidders in this segment

#Likely bidderFitWins
1idverde Realisatie B.V.SME10046×
2Wallaard Groen B.V.SME9917×
3Donker Groep B.V.SME9687×
4Krinkels B.V.SME9666×
5Verkuil & Moree B.V.SME9622×
6Vaarkamp bvSME9625×

08Tender documents

Raamovereenkomst groen- en boomrenovaties BESTEK INCL NVIpdfDec 4, 2025 · 922 KB
Raamovereenkomst groen- en boomrenovaties BESTEK INCL NVIrsxDec 4, 2025 · 1015 KB
Vragen NVI 1 04122025xlsxDec 4, 2025 · 13 KB
Raamovereenkomst groen- en boomrenovaties NVIpdfDec 4, 2025 · 101 KB
Raamovereenkomst groen- en boomrenovaties NVInsxDec 4, 2025 · 77 KB
Aanbestedingsdocumenten Groen- en boomrenovaties BarendrechtzipNov 4, 2025 · 46425 KB
TN554376 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20251103101211pdfNov 4, 2025 · 10 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the expected duration of the framework agreement?
The agreement commences on 1 March 2026 with an initial term of 16 months until 30 June 2027. The contracting authority has the right to extend the agreement once, three times, for 12 months each, resulting in a maximum duration of slightly more than four years.
Which works fall under the scope of this assignment?
The assignment includes the renovation of greenspace areas and the removal of trees within the Municipality of Barendrecht. Specific works include, among others, the removal of woodland, bed planting, shrubs, and perennials, the removal of trees and stumps, earthworks, drainage, and various planting works.
When is work permitted at the locations?
The permitted working hours are Monday to Friday between 07:00 and 19:00, including a night period from Monday to Friday.
Why was a specific end date for the agreement chosen?
The agreement preferably ends at the end of the usual working season (end of June) to ensure continuity of service and to prevent risks of disruption during the winter season in the event of a change of supplier.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 260K
median
€ 600K
p75
€ 1,8 mln
deze opdracht

Gegunde waarden in CPV 77 · diensten n=1648