Fiber optic drinking water locations Waternet 2025

Stichting Waternet · Open · 1 lots · 364943
Type
Works
45232000
Estimated value
€ 1,66M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Fiber optic replacement at four drinking water locations; step-2 construction team contract; unknown value.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
€1,660,000
estimated value
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

Fiber optic replacement at four drinking water locations; step-2 construction team contract; unknown value.

At 4 drinking water locations, the current fiber optic cables are of OM1 quality and therefore have low bandwidth, speed, and shorter distances for future expansions of optimization, management, and physical security. OM1 does not support 1 Gigabit Ethernet and 10 Gigabit Ethernet up to a max. of 30 meters. These OM1 fiber optic cables must be replaced at the LDN, WPK, NWG, and LVN sites between the various buildings with type OM4. This tender concerns a full-scale assignment following the previously performed PoC activities. These activities involve providing the drinking water locations with

45232000€ 1,66MWorks
1Fiber optic drinking water locations Waternet 2025€1,660,000

02Value in context

€1,660,000

03Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9465×
2BAM Infra B.V.SME9377×
3Boskalis Nederland B.V.SME9369×
4Van Gelder BVSME9353×
5ENGIE Infra & Mobility B.V.SME9369×
6SPIE Nederland B.V.SME8823×

04Legal themes that may be relevant here

05Frequently asked questions

What is the technical core of the assignment?
The assignment involves replacing current OM1 fiber optic cables with type OM4 at the LDN, WPK, NWG, and LVN sites to increase bandwidth and speed.
Which contract form is used for this assignment?
A Construction Team 2-phase contract is assumed. This is a Construction Team agreement where the contract formation is established during the design phase (UO).
Which conditions apply during the realization phase?
In the realization phase, the contract provides for a Works Contract under the applicability of the UAV 2012 and the BAV (special supplementary conditions).
Why is the replacement of the fiber optic cables taking place?
The current OM1 cables do not support 1 Gigabit Ethernet and 10 Gigabit Ethernet up to a maximum of 30 meters, which imposes limitations for future expansions and optimization.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 1,7 mln

Gegunde waarden in CPV 45 · werken n=3159