ClosedWorksEuropeanRestrictedGreen

Municipality of Zwolle - Realisation of superstructure pedestrian bridge

Gemeente Zwolle · Restricted · 1 lots · 322258
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Zwolle intends to realise a sustainable, 10-meter wide pedestrian bridge (passerelle) over the railway lines. The assignment concerns the superstructure of the bridge, including an 'elevated street' with greenery, benches, and art. The construction must consist primarily of wood and other sustainable materials. In addition to the bridge, roof gardens (excluding planting), water systems for play water and irrigation, and maintenance of these installations for two years (with an option to extend) are mandatory. The public space at the northern entrance must be designed; the southern side is optional. Delivery of baked paving stones is part of the scope, with the exception of stones already purchased for the north square. The tender is non-public and fully funded by the municipality.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
09:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPpasserelleZwollepedestrian bridge

01What is being requested

The Municipality of Zwolle intends to realise a sustainable, 10-meter wide pedestrian bridge (passerelle) over the railway lines. The assignment concerns the superstructure of the bridge, including an 'elevated street' with greenery, benches, and art. The construction must consist primarily of wood and other sustainable materials. In addition to the bridge, roof gardens (excluding planting), water systems for play water and irrigation, and maintenance of these installations for two years (with an option to extend) are mandatory. The public space at the northern entrance must be designed; the southern side is optional. Delivery of baked paving stones is part of the scope, with the exception of stones already purchased for the north square. The tender is non-public and fully funded by the municipality.

The passerelle in Zwolle will be a new footbridge over the tracks connecting the north side and the south side of the station. The passerelle will be implemented as a pedestrian connection. It will be an 'elevated street' where people can walk and linger. A bridge 10 meters wide over the tracks, with plenty of greenery, benches, and art, constructed from wood and sustainable materials. The passerelle will be realised in phases, consisting of a substructure and superstructure. The preceding assignment relates to the realisation of the superstructure. The passerelle is being realised at the init

45000000Works
1Municipality of Zwolle - Realisation of superstructure pedestrian bridge

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME10058×
2Van Gelder BVSME10053×
3KWS Infra B.V.SME9692×
4SPIE Nederland B.V.SME9623×
5BAM Infra B.V.SME9577×
6Combinatie Heijmans - SWARCOUnknown9373×

05Legal themes that may be relevant here

06Frequently asked questions

What is the exact scope of the assignment for the realisation of the superstructure?
The assignment includes the civil engineering works, the construction of roof gardens (excluding planting), the supply and installation of water systems for play water and irrigation, the design of the public space at the north side, and the delivery of baked paving stones (with the exception of the stones already purchased for the north square).
What does the assignment entail regarding the maintenance of the installations?
The assignment includes the maintenance of the water systems for two years, with the possibility of two options to extend for one year each.
Will the design of the south side of the passerelle also be realised?
The design of the public space at the entrance of the south side is not within the scope of this contract, but is included as an option or provisional sum in the specifications.
What materials and characteristics are expected for the new pedestrian bridge?
The passerelle will be a 10-meter wide pedestrian connection that functions as an 'elevated street' with greenery, benches, and art, where the construction consists primarily of wood and other sustainable materials.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159