Municipality of Zwolle - Realisation of superstructure pedestrian bridge
The Municipality of Zwolle intends to realise a sustainable, 10-meter wide pedestrian bridge (passerelle) over the railway lines. The assignment concerns the superstructure of the bridge, including an 'elevated street' with greenery, benches, and art. The construction must consist primarily of wood and other sustainable materials. In addition to the bridge, roof gardens (excluding planting), water systems for play water and irrigation, and maintenance of these installations for two years (with an option to extend) are mandatory. The public space at the northern entrance must be designed; the southern side is optional. Delivery of baked paving stones is part of the scope, with the exception of stones already purchased for the north square. The tender is non-public and fully funded by the municipality.
Works · Restricted · European procedure
01What is being requested
The Municipality of Zwolle intends to realise a sustainable, 10-meter wide pedestrian bridge (passerelle) over the railway lines. The assignment concerns the superstructure of the bridge, including an 'elevated street' with greenery, benches, and art. The construction must consist primarily of wood and other sustainable materials. In addition to the bridge, roof gardens (excluding planting), water systems for play water and irrigation, and maintenance of these installations for two years (with an option to extend) are mandatory. The public space at the northern entrance must be designed; the southern side is optional. Delivery of baked paving stones is part of the scope, with the exception of stones already purchased for the north square. The tender is non-public and fully funded by the municipality.
The passerelle in Zwolle will be a new footbridge over the tracks connecting the north side and the south side of the station. The passerelle will be implemented as a pedestrian connection. It will be an 'elevated street' where people can walk and linger. A bridge 10 meters wide over the tracks, with plenty of greenery, benches, and art, constructed from wood and sustainable materials. The passerelle will be realised in phases, consisting of a substructure and superstructure. The preceding assignment relates to the realisation of the superstructure. The passerelle is being realised at the init
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the exact scope of the assignment for the realisation of the superstructure?
What does the assignment entail regarding the maintenance of the installations?
Will the design of the south side of the passerelle also be realised?
What materials and characteristics are expected for the new pedestrian bridge?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159