Municipality of Ommen - Construction team slow traffic tunnel Haarsweg
The Municipality of Ommen intends to realize a slow traffic tunnel under the Slagenweg at the Haarsweg as part of a North-South cycle route. The project consists of a design phase and an execution phase, during which a construction team will be formed between the municipality and a contractor. The tunnel must be safe and of high technical quality, the Haarsweg to the north must receive a detached cycle path, and the works must comply with the UAV 2012. The tender is not-public and requires collaboration in a construction team format, including the sharing of expertise and the joint drafting of execution conditions.
Works · Restricted · National procedure
01What is being requested
The Municipality of Ommen intends to realize a slow traffic tunnel under the Slagenweg at the Haarsweg as part of a North-South cycle route. The project consists of a design phase and an execution phase, during which a construction team will be formed between the municipality and a contractor. The tunnel must be safe and of high technical quality, the Haarsweg to the north must receive a detached cycle path, and the works must comply with the UAV 2012. The tender is not-public and requires collaboration in a construction team format, including the sharing of expertise and the joint drafting of execution conditions.
This tender is aimed at the design and realization of a slow traffic tunnel at the level of the Haarsweg. Within this project, the Municipality of Ommen (hereinafter: the municipality) faces the task of realizing a high-quality North-South cycle route along the Haarsweg in Ommen. This is to be achieved through a tunnel for slow traffic under the Slagenweg at the level of the Haarsweg. In addition, the Haarsweg north of the Slagenweg will be equipped with a detached cycle path. It is important to note that the Haarsweg north of the Slagenweg will be equipped with a detached cycle path. The ma
02Value in context
03Likely competitors
04Legal themes that may be relevant here
05Frequently asked questions
What is the specific objective of this project?
In which phases is the assignment divided?
In what manner does the collaboration take place?
Which legal conditions apply to the execution?
Automatically compiled from the official tender data and documents.
06Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159