ClosedWorksEuropeanRestricted

Municipality of Molenlanden - New construction of town hall

Gemeente Molenwaard · Restricted · 271818
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Molenlanden (formerly Molenwaard) has a non-public tender for the new construction of a town hall south of Dorpshuis De Spil. The project focuses on creating a cluster of public functions, where the new and existing buildings are seamlessly connected. The location was chosen to strengthen the interaction between the facilities of De Spil (central catering, meeting areas, community café). A key design challenge is minimizing the distance between the two buildings to ensure mobility and optimal use of the cluster. The tender concerns a work assignment without a CPV code, focused on building and construction works. The municipality expects an integrated approach where architecture, infrastructure, and public services converge.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tendertown hallnew constructioncluster

01What is being requested

The Municipality of Molenlanden (formerly Molenwaard) has a non-public tender for the new construction of a town hall south of Dorpshuis De Spil. The project focuses on creating a cluster of public functions, where the new and existing buildings are seamlessly connected. The location was chosen to strengthen the interaction between the facilities of De Spil (central catering, meeting areas, community café). A key design challenge is minimizing the distance between the two buildings to ensure mobility and optimal use of the cluster. The tender concerns a work assignment without a CPV code, focused on building and construction works. The municipality expects an integrated approach where architecture, infrastructure, and public services converge.

The design of the new construction of the work location is positioned south of Dorpshuis De Spil. This creates a cluster of public functions and a good connection between De Spil and the new construction. This facilitates and stimulates mutual interaction, in which the facilities in De Spil (such as the central catering, meeting areas, and 'community café') play an important role. Movement between the two buildings - and thus the optimal use of the cluster - decreases as the distance between the buildings increases.

45000000Works

02Outcome

Awarded

Kuijpers Bouw Heteren B.V.

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1BINX Smartility B.V.SME9927×
2BAM Bouw en Techniek bvSME9634×
3Croonwolter&dros B.V.SME9625×
4Hegeman Bouw & Infra B.V.SME9431×
5Heijmans Utiliteit B.V.SME9427×
6Van Gelder BVSME9453×

06Legal themes that may be relevant here

07Frequently asked questions

What is the purpose of the new construction of the town hall?
The purpose is the realization of a new town hall south of Dorpshuis De Spil, creating a cluster of public functions with a good connection between the new construction and De Spil.
What role does the connection with Dorpshuis De Spil play in the project?
The connection between the new construction and De Spil is intended to stimulate mutual interaction, making use of facilities such as the central catering, meeting areas, and the community café.
What is an important design aspect for the cluster of public functions?
A key design challenge is minimizing the distance between the new construction and the existing buildings to ensure mobility and the optimal use of the cluster.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159