AwardedWorksRestrictedGreen

A67 Noise Barrier Municipality of Someren

Gemeente Someren · Restricted · 1 lots · 342194
Type
Works
45220000
Estimated value
€ 3,35M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Someren has awarded a Design-Build-Maintain (DBM) contract for the construction and maintenance of a new noise barrier. The assignment, based on the UAV-GC 2005, includes design, execution, and two years of grounds maintenance. An integrated contract without lots was chosen to increase efficiency and reduce the risk of errors.

Works · Restricted · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Restricted
Estimated value
€3,350,000
estimated value
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPP

01What is being requested

The Municipality of Someren has awarded a Design-Build-Maintain (DBM) contract for the construction and maintenance of a new noise barrier. The assignment, based on the UAV-GC 2005, includes design, execution, and two years of grounds maintenance. An integrated contract without lots was chosen to increase efficiency and reduce the risk of errors.

The agreement consists of the design and realization of a new noise barrier based on a requirements specification. This concerns generic works that can be performed by contractors specializing in noise barriers. Due to the complexity of the project, an integrated contract has been deliberately chosen, in this case a Design, Build and Maintain agreement (hereinafter: DBM agreement) based on the UAV-GC 2005. The Uniform Administrative Conditions for integrated contract forms 2005 (UAV-GC 2005) apply to the contract to be awarded. In addition to the design and realization of the noise barrier, gr

45220000€ 3,35MWorks
1A67 Noise Barrier Municipality of Someren€3,350,000

02Outcome

Awarded

Schreuder Bouwen Langs Water en Wegen B.V. (Gebr. Remmits B.V.)

Award value
€2,582,000
vs. estimate
-23%
Bidders
2

03Value in context

€3,350,000

04Bidders in this segment

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9873×
2Dura Vermeer Infra Regionale Projecten BVSME9858×
3Heijmans Infra B.V.SME9765×
4De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9526×
5KWS Infra B.V.SME9392×
6BAM Infra B.V.SME9377×

05Legal themes that may be relevant here

06Frequently asked questions

What does the contract form of this assignment entail?
A Design, Build and Maintain agreement (DBM) has been chosen. This means that the contracting authority places design, realization, and maintenance with a single party to improve the integration between the program of requirements, the design, and the execution.
Which conditions apply to the execution of the works?
The assignment is based on the Uniform Administrative Conditions for integrated contract forms 2005 (UAV-GC 2005).
What is the scope of the maintenance included in the assignment?
In addition to the design and realization of the noise barrier, grounds maintenance is part of the assignment. This maintenance has a duration of two years after the realization of each individual phase.
Why was a subdivision into lots not chosen?
Due to the complexity of the project, an integrated contract without lots was chosen. This is intended to increase efficiency, reduce the risk of error, and achieve better coordination between design and realization.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 3,4 mln

Gegunde waarden in CPV 45 · werken n=3159