AwardedWorksEuropeanOpenGreen

Area Zuid-West - Best Spoortunnel: realizing replacement of TTI control, BMI and OAI 2025 M-004899

ProRail B.V. · Open · 1 lots · 343936
Type
Works
45221242
Estimated value
€ 4,62M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
3 criteria
Assess manuallyconfidence high

The assignment concerns the realization of the replacement of the TTI control, BMI and OAI in the Best Spoortunnel. The works include various technical renewals and sustainability measures.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
€4,623,621
awarded value
Submission deadline
Ongoing
11:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPP

01What is being requested

Renewal of the tunnel control (TTI), BMI, OAI, fiber optic network, CCTV server, ventilation components and the control cabinet of the fire extinguishing installation including sustainability measures.

The tunnel control and a number of (auxiliary) installations must be renewed. The assignment includes the following scope elements: [newline] [newline]• Renewing TBI in accordance with ProRail Tunnel Standard (PTS); [newline]• Integrating TBI into the ProRail business management system (PSI); [newline]• Renewing active components of the tunnel fiber optic network (LAN); [newline]• Replacing a Fire Alarm Installation (BMI); [newline]• Replacing a Public Address & Alarm Installation (OAI); [newline]• Replacing CCTV server including video storage and switch; [newline]• TTI ventilation: Replacing

45221242Works
1Area Zuid-West - Best Spoortunnel: realizing replacement of TTI control, BMI and OAI 2025 M-004899

02Outcome

Awarded

Besix Unitec Nederland BV

Award value
€4,623,621
Bidders
1

03Strategic insight

Strategic insight · AI analysis
Focus on a high CO2 ambition level to realize a fictitious discount on the tender sum. Ensure a Plan of Approach that specifically addresses the three objectives for quality and system integration. The tender sum must fully align with the substantiated budget.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

The TVP framework may shift to a later date during the procedure.
The tender sum must be substantiated in the budget.

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

Sustainability: CO2 Performance Ladderweight n/a

Quality value is calculated as a fictitious discount on the tender sum based on the indicated CO2 ambition level (level 1 to 5).

Quality: Plan of Approachweight n/a

Assessment of an approach with measures for three objectives: completion within the TVP framework, timely system integration and certification, and insight into realization, verification and validation in accordance with requirements and regulations.

Price (for UAV-gc)weight n/a

The best price-quality ratio is determined by the lowest evaluation price, consisting of the tender sum minus the discount based on the CO2 Performance Ladder plus/minus the quality values of the Plan of Approach.

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Bidders in this segment

#Likely bidderFitWins
1BAM Infra B.V.SME10077×
2ENGIE Infra & Mobility B.V.SME10069×
3Dura Vermeer Infra Regionale Projecten BVSME9958×
4Heijmans Infra B.V.SME9965×
5Combinatie Heijmans - SWARCOUnknown9873×
6KWS Infra B.V.SME9692×

09Tender documents

TN455677 - EF30 Aankondiging gegunde opdracht - sectorale richtlijn, standaardregeling 20250114165249pdfJan 16, 2025 · 11 KB
NvI 4zipOct 4, 2024 · 11978 KB
NvI 3zipSep 13, 2024 · 10721 KB
NvI 2zipAug 30, 2024 · 7115 KB
NvI 1zipAug 22, 2024 · 1803 KB
Aanbestedingsdossier M-004899 deel 3zipJul 20, 2024 · 1318322 KB
Aanbestedingsdossier M-004899 deel 2zipJul 20, 2024 · 1944219 KB
TN455677 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20240718184959pdfJul 20, 2024 · 14 KB
Aanbestedingsdossier M-004899 deel 1zipJul 20, 2024 · 493138 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the exact scope of the works in the Best Spoortunnel?
The assignment includes the renewal of the TBI in accordance with the ProRail Tunnel Standard (PTS), integration of TBI into the PSI business management system, renewal of active components of the fiber optic network (LAN), and the replacement of the Fire Alarm Installation (BMI), Public Address & Alarm Installation (OAI), CCTV server, TTI ventilation components (MCUs, I/O relays, motor protection units) and the control cabinet of the fire extinguishing installation (BBI).
Which sustainability aspects are part of the assignment?
In addition to the technical renewal of the tunnel control and installations, the implementation of sustainability measures is explicitly included in the scope of the assignment.
What is the expected duration of the execution?
The execution of the works is planned with a start date of 17/12/2024 and an end date of 01/08/2026.
Can the timing of the TVP framework still change?
Yes, the TVP framework of this project may shift to a later date during the procurement procedure, as stated in the Leidraad Openbare Aanbesteding, paragraph 2.1.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 4,6 mln

Gegunde waarden in CPV 45 · werken n=3159