Zuid-Holland Area - Realization of major maintenance for 4 bridges

ProRail B.V. · Restricted · 1 lots · 379690
Type
Works
45221100
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
3 criteria
Assess manuallyconfidence high

This project includes the major maintenance of four bridges in Zuid-Holland for ProRail. The award is based on the best price-quality ratio, whereby the CO2 performance ladder provides a discount on the bid sum.

Works · Restricted · European procedure

Sustainability countsEuropeanComplete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPP

01What is being requested

The assignment concerns the major maintenance of 4 bridges in the Zuid-Holland area, specifically the Baanhoekbrug, Merwedekanaalbrug, Brug Galgewater and Markbrug.

The scope of the project comprises the major maintenance of 4 bridges in the Zuid-Holland area: • Baanhoekbrug • Merwedekanaalbrug (Arkel) • Brug Galgewater • Markbrug

45221100Works
1Lot 1

02Outcome

Awarded

Strukton Systems B.V.

Bidders
3

03Strategic insight

Strategic insight · AI analysis
Focus on a high CO2 ambition level to benefit from the fictitious discount on the evaluation price. Ensure a solid substantiation of the bid sum in the budget. The plan of approach for the lead time of TVP's is essential for the price calculation.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 3
The evaluation price is calculated with a fictitious discount on the bid sum.Important
The bid sum must be substantiated in the budget.Important
Variants are not permitted.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

G2 Plan of approach securing lead time TVP'sweight n/a

Assessment of the plan of approach for securing the lead time of TVP's.

G3 Sustainability: CO2 performance ladderweight n/a

Quality value is calculated via a fictitious discount percentage on the bid sum based on the CO2 ambition level (step 1 to 5).

G1 Price (for UAV-gc)weight n/a

The lowest evaluation price is determined by the bid sum minus the discounts based on the plan of approach and the CO2 performance ladder.

07Process & timeline

Requests for additional information
03/06/2025 10:00 +02:00
Deadline for receipt of requests to participate
17/06/2025 10:00 +02:00
Expected date of sending invitations
17/07/2025
Start date
11/11/2025
End date
01/07/2028

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

09Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME9892×
2BAM Infra B.V.SME9577×
3Combinatie Heijmans - SWARCOUnknown9573×
4Dura Vermeer Infra Regionale Projecten BVSME9558×
5SPIE Nederland B.V.SME9223×
6Boskalis Nederland B.V.SME9169×

10Tender documents

TN527147 - EF30 Aankondiging gegunde opdracht - sectorale richtlijn, standaardregeling 20260302133400pdfMar 3, 2026 · 208 KB
TN527147 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20250521141336pdfMay 22, 2025 · 9 KB
Selectieleidraad - Gebied Zuid-Holland - Realisatie groot onderhoud 4 bruggenzipMay 22, 2025 · 2373 KB

11Legal themes that may be relevant here

12Frequently asked questions

Which bridges are included within the scope of this project?
The major maintenance concerns the following four bridges in the Zuid-Holland area: the Baanhoekbrug, the Merwedekanaalbrug (Arkel), the Brug Galgewater and the Markbrug.
What is the expected duration of the execution?
The execution of the works has a start date of 30/01/2026 and an end date of 01/07/2028. There is no possibility for extension (maximum number of extensions: 0).
On which criteria is the best price-quality ratio determined?
The evaluation price is calculated based on the bid sum (G1), the plan of approach for securing the lead time of TVP's (G2) and sustainability via the CO2 performance ladder (G3).

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159