Area Zee-Zevenaar - One-time flushing of fire extinguishing pipelines Rotterdam port sites
ProRail B.V. is requesting a one-time flushing of fire extinguishing pipelines at the port sites in Rotterdam. The assignment includes the design of a temporary fire extinguishing pipeline system, assessing the existing pipeline system for technical suitability for a flow rate of 3 m/s, and modifying the current system, including the production of tie-ins and manifolds. Additionally, a flushing plan must be drafted and executed using mobile pump and booster systems in a closed water circuit with containers. After flushing, the temporary modifications will be dismantled and demobilization will be carried out. The contracting authority requires supervision during execution and careful coordination with the current contractors. The procedure is a negotiated procedure without prior publication, aimed at a service provider with expertise in fire extinguishing installations, engineering, and project management.
Services · Onderhandeling zonder bekendmaking · European procedure
01What is being requested
ProRail B.V. is requesting a one-time flushing of fire extinguishing pipelines at the port sites in Rotterdam. The assignment includes the design of a temporary fire extinguishing pipeline system, assessing the existing pipeline system for technical suitability for a flow rate of 3 m/s, and modifying the current system, including the production of tie-ins and manifolds. Additionally, a flushing plan must be drafted and executed using mobile pump and booster systems in a closed water circuit with containers. After flushing, the temporary modifications will be dismantled and demobilization will be carried out. The contracting authority requires supervision during execution and careful coordination with the current contractors. The procedure is a negotiated procedure without prior publication, aimed at a service provider with expertise in fire extinguishing installations, engineering, and project management.
The works mainly include: • Engineering of a temporary fire extinguishing pipeline system; • Engineering of the existing pipeline system (review of the Final Design by the current contractors of the relevant pipeline system). This engineering step must determine whether the current system is technically suitable for the flow (discharge) of 3 m/s and that it cannot cause damage to the existing system; • Modifying the existing fire extinguishing pipeline system (including production of tie-ins and manifolds); • Drafting a flushing plan and executing flushing works by means of mobile pump and bo
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What does the assignment for the flushing of the fire extinguishing pipelines entail?
What technical works are expected when modifying the system?
What is the purpose of the engineering of the existing pipeline system?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 295K
€ 672K
€ 1,5 mln