East Area - Realization of BBV Gelre 2024 D-003098 and FH TB Tiel-Elst D-003124

ProRail B.V. · Onderhandse procedure · 1 lots · 317111
Type
Works
45234000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

ProRail B.V. is conducting a non-public negotiated procedure for the realization of BBV Gelre 2024 (D-003098) and FH TB Tiel-Elst (D-003124). The BBV works include approximately 26.5 km of track renewal between Vork (km 2.9) and Kesteren (km 20.3), including lime stabilization, drainage improvement, renewal of level crossings, and drainage. Additionally, one NABO will be removed. The FH-TB works focus on renewing train protection components between Tiel-Kesteren and Kesteren-Vork, including converting AZ-L90 axle counters to AZ-LM and replacing ATB-NG encoders. The procedure is based on ARN2016 Part II and the European ProRail Recognition Scheme (EP2019).

Works · Onderhandse procedure · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Onderhandse procedure
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPBBVtrack renewalrailway safety

01What is being requested

ProRail B.V. is conducting a non-public negotiated procedure for the realization of BBV Gelre 2024 (D-003098) and FH TB Tiel-Elst (D-003124). The BBV works include approximately 26.5 km of track renewal between Vork (km 2.9) and Kesteren (km 20.3), including lime stabilization, drainage improvement, renewal of level crossings, and drainage. Additionally, one NABO will be removed. The FH-TB works focus on renewing train protection components between Tiel-Kesteren and Kesteren-Vork, including converting AZ-L90 axle counters to AZ-LM and replacing ATB-NG encoders. The procedure is based on ARN2016 Part II and the European ProRail Recognition Scheme (EP2019).

The procurement is conducted as a non-public procedure based on ARN2016 Part II as well as the ProRail Recognition Scheme (EP2019) published as a European call for competition, railway contractors sector branch.

45234000Works
1East Area - Realization of BBV Gelre 2024 D-003098 and FH TB Tiel-Elst D-003124

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Strukton Rail Nederland bvSME10034×
2VolkerRail Nederland B.V.SME10030×
3BAM Infra B.V.SME9677×
4Swietelsky Rail Benelux B.V.SME9622×
5Dura Vermeer Infra Regionale Projecten BVSME9658×
6Combinatie Heijmans - SWARCOUnknown9573×

04Legal themes that may be relevant here

05Frequently asked questions

What is the extent of the track renewal within the BBV scope?
The works include approximately 26.5 km of track renewal between Vork (km 2.9) and Kesteren (km 20.3), including the application of lime stabilization.
Which specific works are being carried out regarding drainage and level crossings?
The works include improving the drainage of the track between Zetten-Andelst and Kesteren, renewing 13 level crossings, and installing 200 m of drainage just past Kesteren towards Tiel.
Which works fall under the FH-TB scope?
The FH-TB scope concerns the renewal of train protection components between Tiel-Kesteren and Kesteren-Vork, specifically converting AZ-L90 axle counters to AZ-LM and replacing ATB-NG encoders.
On which regulations is this tender based?
The assignment is based on ARN2016 Part II and the ProRail Recognition Scheme (EP2019) published as a European call for competition, railway contractors sector branch.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159