ClosedWorksOnderhandse procedureGreen

Area East - Realisation BBV Gelre 2024 Arnhem Berg D-003093B

ProRail B.V. · Onderhandse procedure · 1 lots · 317976
Type
Works
45234000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender concerns the realisation of the BBV Gelre 2024 in the Area East, Arnhem Berg, carried out by ProRail B.V. It concerns a multiple award procedure with negotiation (ARN2016 Part III). The assignment includes various works on the railway network, including the installation, maintenance, and modernisation of infrastructure. The contracting authority expects a high level of safety, quality, and compliance with environmental standards. Suppliers must demonstrate that they have experience with similar projects, possess the necessary certifications, and can provide a realistic schedule. The procedure is aimed at selecting one or more suitable contractors who can realise the works within the specified timeframe. The details of the works are included in the tender dossier.

Works · Onderhandse procedure · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Onderhandse procedure
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPProRailBBV GelreArnhem Berg

01What is being requested

The tender concerns the realisation of the BBV Gelre 2024 in the Area East, Arnhem Berg, carried out by ProRail B.V. It concerns a multiple award procedure with negotiation (ARN2016 Part III). The assignment includes various works on the railway network, including the installation, maintenance, and modernisation of infrastructure. The contracting authority expects a high level of safety, quality, and compliance with environmental standards. Suppliers must demonstrate that they have experience with similar projects, possess the necessary certifications, and can provide a realistic schedule. The procedure is aimed at selecting one or more suitable contractors who can realise the works within the specified timeframe. The details of the works are included in the tender dossier.

The procurement takes place as a multiple award procedure with negotiation based on ARN2016 Part III. The works are stated in the tender dossier.

45234000Works
1Area East - Realisation BBV Gelre 2024 Arnhem Berg D-003093B

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Strukton Rail Nederland bvSME10034×
2VolkerRail Nederland B.V.SME10030×
3BAM Infra B.V.SME9677×
4Swietelsky Rail Benelux B.V.SME9622×
5Dura Vermeer Railinfra B.V.SME9520×
6Heijmans Infra B.V.SME9465×

04Legal themes that may be relevant here

05Frequently asked questions

What is the nature of the works in this project?
The assignment concerns the realisation of BBV Gelre 2024 in the Area East - Arnhem Berg, whereby works are carried out on the railway network.
What specific requirements are imposed on the execution?
The contracting authority imposes requirements regarding the level of safety, quality, and compliance with environmental standards during the realisation of the works.
Which criteria apply to the execution of the assignment?
Sustainability criteria apply to this assignment.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159