AwardedWorksEuropeanRestrictedGreen
Gebied Midden - Conserving artworks 2025 (L-005360 Part 2)
ProRail B.V. · Restricted · 1 lots · 344076
5
5 of 6 core insights found
Measures presence, not accuracy · documents remain authoritative
ScopeAdvicePoints of attentionSuitability requirementsAward criteriaTimeline
Type
Works
45200000
Estimated value
€ 7,57M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high
This contract concerns the conservation of three steel track-bearing artworks for ProRail. The award is based on the best price-quality ratio, in which the CO2 performance ladder plays a role.
Works · Restricted · European procedure
Sustainability countsEuropean
CharacteristicsCPV 45WorksEU tenderGreen / SPP
01What is being requested
The project concerns the conservation of three steel track-bearing artworks in the Gebied Midden area. The contract has an expected duration from January 2025 to August 2027.
The project aims to conserve three steel track-bearing artworks.
1Conserving artworks 2025 (L-005360 Part 2)—
02Outcome
Awarded
Hegeman Bouw Civiel B.V.
Award value
€7,570,000
Bidders
2
03Strategic insight
Strategic insight · AI analysis
Focus on a high <strong class='CO2-ambitieniveau'>CO2 ambition level to maximize the fictitious discount on the bid price. Ensure an accurate <strong class='onderbouwing'>substantiation of the bid price within the budget.
04Points of attention
The evaluation price is determined by reducing the bid price by the <strong class='fictieve korting'>fictitious discount based on the CO2 performance ladder.
The bid price must be submitted on the tender form and substantiated in the <strong class='begroting'>budget.
05Exclusion grounds
Exclusion grounds — consult the ESPD
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
06Award criteria
Sustainability: CO2 performance ladderweight n/a
The quality value is calculated as a fictitious discount on the bid price based on the indicated CO2 ambition level (step 1 to 5).
Price (for UAV-gc)weight n/a
The bid price must be substantiated in the budget.
07Value in context
Estimate not published
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
08Bidders in this segment
#Likely bidderFitWins
1BAM Infra B.V.SME9777×
2Heijmans Infra B.V.SME9765×
3Dura Vermeer Infra Regionale Projecten BVSME9658×
4KWS Infra B.V.SME9592×
5Combinatie Heijmans - SWARCOUnknown9573×
6Strukton Rail Nederland bvSME9434×
09Tender documents
TN473272 - EF30 Aankondiging gegunde opdracht - sectorale richtlijn, standaardregeling 20250219100552pdfFeb 20, 2025 · 10 KB
Nota van inlichtingen 2024-09-04-1pdfSep 4, 2024 · 3 KB
TN473272 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20240729153847pdfJul 29, 2024 · 14 KB
TN473272 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20240719165930pdfJul 21, 2024 · 14 KB
Selectieleidraad_TN-473272 (L-005360 Deel 2)zipJul 21, 2024 · 2302 KB
10Legal themes that may be relevant here
Advies 97> Europese openbare procedure met betrekking tot de vervanging van kunstwerken. Is de door de aanbestedende dienst opgegeven ➭vies 442> Europese openbare procedure voor een overheidsopdracht voor werken voor het ontwerpen en uitvoeren van integraal groot onderhoudComplaint upheldAdvies 98> Europese openbare aanbestedingsprocedure voor een raamovereenkomst met één ondernemer voor het vervangen van armaturen (straatveAdvies 48> Europese niet-openbare procedure voor werktuigkundige en elektrotechnische installaties van de nieuwbouw van een multifunctionelAdvies 63> Meervoudig onderhandse aanbesteding voor het reinigen van wegen, straten en pleinen. Kan bij gunning op laagste prijs de indieni
11Frequently asked questions
What is the purpose of this project?
The project aims to conserve three steel track-bearing artworks.
What is the expected duration of the works?
The estimated duration of the works runs from 31 January 2025 up to and including 25 August 2027.
On which criteria is the best price-quality ratio determined?
The evaluation price is calculated based on the bid price and the CO2 performance ladder (sustainability).
Automatically compiled from the official tender data and documents.
12Estimated value versus the market
p25
€ 1,4 mln
€ 1,4 mln
median
€ 3,6 mln
€ 3,6 mln
p75
€ 9,1 mln
€ 9,1 mln
€ 7,6 mln
Gegunde waarden in CPV 45 · werken n=3159