ClosedWorksEuropeanOpen

EU procurement for Construction Team Pumping Station and Retaining Structure Kromme Rijn

Type
Works
45200000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This document contains the general terms and conditions (UAV 2012) applicable to the execution of works and technical installation works.

Works · Open · European procedure

European
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
09:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

The assignment concerns the execution of works and technical installation works in accordance with the provisions in the agreement and the UAV 2012.

EU procurement for the purpose of contracting one Contractor (either alone or in combination) to work intensively in a construction team relationship with the Contracting Authority to reach a supported design, specification/work description (UAV), risk allocation, and construction sum for a new pumping station with a retaining structure to be built for the water supply to the Kromme Rijn (phase 1). If both parties agree on this, the 2nd phase, the realization of the works, will be awarded. The assignment concerns a one-off assignment.

45200000Works

02Strategic insight

Strategic insight · AI analysis
Ensure strict compliance with the UAV 2012 conditions. During submission, check if there are restrictions regarding free access to locations due to trade secrets. Take into account the liability for damage to surrounding works and property.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The contractor is obliged to warn the management in case of contradictions in the specification.Important
The contractor must ensure order and safety at the works.Important
When using subcontractors, written approval from the management is required.Important
The contractor is jointly and severally liable if two or more persons have taken on the work jointly.Important
The contractor must have domicile in the Netherlands if they are not established there.Important

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Likely competitors

#Likely bidderFitWins
1ENGIE Infra & Mobility B.V.SME9969×
2KWS Infra B.V.SME9892×
3BAM Infra B.V.SME9877×
4Boskalis Nederland B.V.SME9869×
5Dura Vermeer Infra Regionale Projecten BVSME9858×
6Heijmans Infra B.V.SME9865×

07Tender documents

TN469359 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20241205094202pdfDec 6, 2024 · 10 KB
GKR, Inschrijvingsleidraad 3.0 - gepubliceerd bij NvI 2024-09-16-1pdfSep 16, 2024 · 1284 KB
GKR, Inschrijvingsleidraad, Bijlage 11 Concept bouwteamovereenkomst_Gemaal_Kromme_Rijn 3.0 - gepubliceerd bij NvI 2024-09-16-1docxSep 16, 2024 · 93 KB
Bijlage K - Quickscan_Wnb_2023_HDSR_Inlaat_Kromme_Rijn_WbD_V3 definitief 21 maart 2024pdfSep 16, 2024 · 2679 KB
Nota van inlichtingen 2024-09-16-1pdfSep 16, 2024 · 31 KB
Nota van inlichtingen 2024-09-05-1pdfSep 5, 2024 · 12 KB
Nota van inlichtingen 2024-07-22-1pdfJul 22, 2024 · 6 KB
GKR, Inschrijvingsleidraad, Bijlage 12 Beoordelingsmatrix (versie 2)xlsJul 17, 2024 · 56 KB
TN469359 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240717175648pdfJul 17, 2024 · 14 KB
GKR, Inschrijvingsleidraad, Bijlage 09 Inschrijfstaat (versie 03)xlsxJul 17, 2024 · 27 KB
Nota van inlichtingen 2024-07-17-1pdfJul 17, 2024 · 15 KB
GKR, Inschrijvingsleidraad, Bijlage J SSK Deelraming Alternatief 1 VKApdfJul 17, 2024 · 370 KB

08Legal themes that may be relevant here

09Frequently asked questions

What is the specific scope of the assignment in phase 1?
In phase 1, the contractor works intensively in a construction team relationship with the contracting authority to reach a supported design, specification/work description (UAV), risk allocation, and construction sum for a new pumping station with a retaining structure to be built.
How does the division between the first and second phase of the assignment proceed?
The assignment concerns a one-off assignment where phase 1 is focused on the design and the construction sum. If both parties reach agreement on the outcomes of phase 1, the second phase (the realization of the works) will be awarded.
Which general terms and conditions apply to the execution of the works?
The Uniform Administrative Conditions for the execution of works and technical installation works 2012 (UAV 2012) apply to this assignment.

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159